Laserfiche WebLink
— -v— \ — V v <br /> Olson's Sewer Service, Inc, .Olson's Excavating Service <br /> 17638 Lyons Street NE <br /> Forest Lake, MN 55025 <br /> (651) 464 -2082 . Fax: (651) 464 -9029 <br /> PROPOSAL. SUBMITTED TO PHONE DATE <br /> City of Centerville, ATTN: Paul Palzer 651- 429 -3232 REVISED 10131/2012 <br /> STREET JOB NAME <br /> 1880 Main Street Volleyball Court and Net Poles, Net, etc. <br /> CITY, STATE AND ZIP CODE JOB LOCATION <br /> Centerville, MN 55038 <br /> ARCHurECT /DESIGNER DATE OF PLANS JOB PHONE <br /> City of Centerville <br /> We hereby submit specifications and estimates for. <br /> 80 x 50' Volleyball Court <br /> We will install dura -base mats to minimize restoration to the recreation site. We will excavate and remove 1.5 feet of soil from the <br /> proposed 80' x 50' volleyball court. We will haul away approximately 222 cubic yards of excavated soil. The sub -grade will be laser - <br /> graded with an automated dozer to insure accuracy. <br /> We will place 78 cubic yard of pea rock which is to be supplied by the City, staged at the parking lot next to the court site. The pea rock <br /> will be laser graded for a depth of approximately six inches. <br /> We will install 60 feet of rigid 4 -inch draintile to include 50 feet on the south sige''of the court area and a 10 foot run on the southwest <br /> corner, running toward the north. The draintile will daylight to the northwest."The draintile will be surrounded with rock and the rock will be <br /> covered with approximately 512 square yards of geotextile 140NC 4 -ounce fabric. We will also install approximately 150 feet of 4 -inch <br /> SDR35 solid piping to include a cleanout in the line and a rodent gtlard'at the point of discharge. The excavation areas will be backfilled <br /> and graded. We will seed, fertilize, and mulch the areas disturbed during the installation of the draintile discharge line. <br /> We will build a 2 x 12" containment border out of ground- contact treated lumber and install this around the perimeter of the court. <br /> We will then haul in and laser grade up to 231 tons of concrete sand for a one foot depth to create the play area of the volleyball court. <br /> We will also install the net poles, net, and necessary apparatus per the attached detailed quote from United Volleyball Supply, Inc. <br /> The cost for this work is $22,387.93. <br /> If mason sand is selected instead of concrete sand, the cost would increase by $3,097.71. <br /> No permits, no asphalt or concrete restoration included. The City is to supply the pea rock. If the City has a disposal site for the <br /> excavated soil, the cost of the proposed work may be reduced if the trucki time is minimized from the time in the above estimate. <br /> Any person or company supplying labor or materials for this improvement to your property may file a lien against <br /> your property if that person or company is not paid for the contributions. Under Minnesota law, you have the right <br /> to pay persons who supplied labor or materials for this improvement directly and deduct this amount from our <br /> contract price, or withhold the amounts due from us until 120 days after completion of the improvement unless we <br /> give you a lien waiver signed by persons who supplied the labor or material for the improvement and who gave you <br /> timely notice. We reserve the right to file a lien if payment in full is not received within 30 days of the invoice date. <br /> Any additional costs will be added to the bill for interest, legal expenses, attorney fees, and for collection costs. <br /> We Propose hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: <br /> AS NOTED ABOVE. <br /> Payment to be made as follows: <br /> TO BE PAID IN FULL WITHIN 30 DAYS OF RECEIPT OF THE INVOICE. <br /> A SIGNED CONTRACT IS NECESSARY TO PERFORM THE WORK DESCRIBED ABOVE. <br /> All material is guaranteed lo be as specified. All work to be completed in a workmanlike manner Authorized Signature <br /> according to standard practices. Ali agreements contingent upon strikes, accidents or delays beyond <br /> our control. Owner to carry fire, lomado and other necessary insurance. Our workers are fully .ION M.OLSON <br /> covered by Workmen's Compensation insurance. <br /> t <br /> Note: We may withdraw this proposal if not acce ted within 15 da s. <br /> Acceptance of Proposal — The above prices, specifications and <br /> conditions are satisfactory and are hereby accepted. You are authorized to Sire <br /> do the work as specified. Payment will be made as outlined above. x <br /> Date of Accept a ____x Signature <br /> Keep Your Sewer in the Pinkl www.olsonsinthepink.com <br />