My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-13 WS Minutes - Approved
Centerville
>
City Council
>
Minutes
>
2010-2023
>
2012
>
2012-06-13 WS Minutes - Approved
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2012 8:48:13 AM
Creation date
12/19/2012 8:48:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />City Council 2011-06-13 6:48 p.m. <br />Minutes of Work Session <br /> <br />Present were Mayor Tom Wilharber, Council members Jeff Paar, Steve King, D Love, <br />and Ben Fehrenbacher. Also present were Mark Statz of Bonestroo & Assoc., City <br />Attorney Kurt Glaser, Public Works Director Paul Palzer and Finance Director Mike <br />Jeziorski. <br /> <br />The purpose of the work session was to cover two agenda items, Stormwater Drainage <br />issues, 2013 Budget. <br /> <br />Stormwater. <br />Council discussed ditch and wet rear yard issues at Meadow Court, <br />Meadow Circler areas (north of Center Street). Public Works Director, Paul Palzer <br />recommended that the city clean the westerly 100 feet of the ditch along with the <br />ditch along Centerville Road to Center Street. This cleaning would cost about $2700, <br />but would not fully solve the problems in this location. It may reduce the upstream <br />water level, but it was noted that large areas are plugged up with cat tails which have <br />impeded drainage. Some members of the council wondered if city staff could dig a <br />narrow trench to get the water flowing again, but it would likely be a very labor <br />intensive solution and would not likely help for more than a year or two. Consensus <br />was to go ahead with the work recommended by staff and then see what impact that <br />work has, before doing anything further. This will be placed on the next agenda. <br /> <br />Budget 2013 <br />. Finance Director, Mike Jeziorski reviewed a draft budget for 2013. The <br />draft would leave General Fund and bond levies at the present level. Minor increases <br />to account for inflation were included along with the cost of the street mill and <br />overlay program. The Council questioned the need for some of the smaller capital <br />items, such as vehicle replacement, and asked staff to justify the numbers before the <br />next meeting. <br /> <br />The council discussed whether it was worth the premium of $7,000 per year to insure <br />property in the open,” such as playground equipment, street lights, hockey rinks and <br />the like. Approximately $40,000 in damage claims have been paid from the insurance <br />to the city for damage to these kinds of equipment, over the past ten years. Consensus <br />was that the insurance coverage should be continued, except staff will see what <br />premium savings would be to accept a higher deductible. <br /> <br />The budget includes the street mill and overlay program expenditures of <br />approximately $390,000. Four of the streets were withdrawn from the 2009 Street <br />Project. Engineer Mark Statz questioned if these streets would be adequately <br />addressed with a simple mill and overlay. He presented options for consideration <br />which ran in cost from $55 per foot to $340 per foot. Consensus of the council was <br />that the intermediate work of full bituminous removal would be the best option for <br />those streets at an estimated cost of $145 per foot. The capital budget would be fully <br />exhausted with those streets so others planned for 2013 would likely be moved to <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.