Laserfiche WebLink
Stantec Consulting Services Inc. <br /> 2335 Highway 36 West <br /> AOL St Paul MN 55113 <br /> Tel: (651) 636 -4600 <br /> Fax: (651) 636 -1311 <br /> Stantec <br /> February 21, 2013 <br /> Honorable Mayor and City Council <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038 -9794 <br /> Re: 2013 Street and Utility Improvements Project <br /> Project No. 193801520 <br /> Bid Results <br /> Dear Honorable Mayor and City Council: <br /> Bids were opened for the Project stated above on February 20, 2013. Transmitted herewith is a copy of the <br /> Bid Tabulation for your information and file. Copies will also be distributed to each Bidder once the Project <br /> has been awarded. <br /> There were a total of 9 Bids. The following summarizes the results of the Bids received: <br /> Contractor Total Base Bid <br /> Low Northdale Construction Co., Inc. $1,533,650.86 <br /> #2 Redstone Construction Co., Inc. $1,582,281.72 <br /> #3 Burschville Construction, Inc. $1,592,253.80 <br /> #4 C & L Excavating, Inc. $1,624,674.22 <br /> #5 Frattalone Companies $1,640,649.87 <br /> #6 T.A. Schifsky & Sons, Inc. $1,641,671.73 <br /> #7 Valley Paving, Inc. $1,751,384.65 <br /> #8 Meyer Contracting Inc. $1,990,492.20 <br /> #9 Dresel Contracting, Inc. $2,292,563.00 <br /> The low Bidder on the Project was Northdale Construction Co., Inc., with a Total Base Bid Amount of <br /> $1,533,650.86. This compares to the Engineer's Estimate of $1,500,644, which includes the feasibility <br /> study estimate, plus the upgraded water main sizing. Overall, this means the bids came in approximately <br /> 2.2% over the estimate. These Bids have been reviewed and found to be in order. <br /> However, there are some larger discrepancies when the costs are broken down a bit. <br /> Improvement /Area Feasibility Report Bid Difference <br /> Streets <br /> Centerville Heights $368,243 $308,606 ($59,637) <br /> Center Oaks 2 $675,129 $852,943 $177,813 <br /> Net Street Improvements $1,043,372 $1,161,549 $118,177 <br /> Water Main <br /> Center Oaks 2 (8" WM) $193,522 $217,494 $23,972 <br /> Upgrade to 12" WM $40,000 $0 ($40,000) <br /> Net Street Improvements $233,522 $217,494 ($16,028) <br />