My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2013
>
2013-03-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2013 12:55:06 PM
Creation date
3/8/2013 12:54:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Centerville <br /> Council Meeting Minutes <br /> February 27, 2013 <br /> f. Area City Collaboration — Utility Systems (Operation, Maintenance & <br /> Distribution of Sanitary Sewer and Water Supply) <br /> Administrator Larson reported that all cities had passed the resolution and a bill number would <br /> be forthcoming. Administrator Larson felt that this had significant potential and continues to <br /> move forward. <br /> g. Building Inspection/Public Works Maintenance Technician Vacant Position <br /> Administrator Larson stated that the City had received approximately 15 applications, has <br /> scheduled eight (8) interviews and anticipates that Staff will have a recommendation for <br /> Council's next meeting. <br /> h. Anoka County Centerville Road/CSAH21 Reconstruction <br /> Engineer Statz reviewed with Council Anoka County's latest proposals and estimated project <br /> cost, which are very preliminary and are for discussion purposes. Engineer Statz reported that <br /> the County has incorporated several desires of Council. Engineer Statz stated that the City's <br /> portion of required costs would be a minimum $140,000 and up to $527,000 which would <br /> include an 48" trunk storm sewer ($280,000) and Sidewalk from Meadow Lane to Dupre Road <br /> on the east side of the roadway ($78,000) and the required construction engineering fees of <br /> $29,000. Council directed Engineer Statz to research the cost share percentages of the City <br /> versus the County. Engineer Statz stated that the County anticipates the project to commence in <br /> 2014 and would cost a total of 1.8 million to complete. <br /> Administrator Larson stated that additional research would be completed as to whether the <br /> County included replacement of a culvert underneath the trail to the park and he felt that the <br /> County may pay a portion of this cost. Administrator Larson felt that the improvement costs for <br /> the City's portion could be paid without bonding due to the delay of the project to 2014. <br /> Lengthy discussion ensued regarding Anoka County's responsibilities for securing easements, <br /> their desire for delaying construction until 2014 when the roadway is currently in horrible <br /> condition. Administrator Larson stated that both the County and Staff felt that to continue the <br /> project at this time, a public input meeting should be held. <br /> Council Member Paar reported that since the Council's previous meeting, Council Members <br /> Love and Fehrenbacher along with residents Mr. Charles Reinhardt and Mr. John Thill have <br /> expressed their willingness to assist with the organization of the annual Fete des Lacs parade that <br /> is scheduled to take place on July 27, 2013. <br /> Mayor Wilharber expressed to the public the importance of keeping fire hydrants clear of snow. <br /> Page 5 of 6 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.