Laserfiche WebLink
<br />(5) Generalized elevations and perspectives of all structures; <br /> <br />(6) A site grading plan indicating the direction of flow of surface drainage and <br />all easements necessary for both ponding and runoff; <br />(7) Plans, profiles and specifications for the distribution of water, collection of <br />sanitary waste and stormwater; <br /> <br />(8) A landscape plan indicating the location, size and type of plant materials to <br />be used; <br /> <br />(9) Plans, profiles, typical sections and specifications for proposed street <br />improvements; and <br /> <br />(10) The density of land use to be allocated to the several parts of the site being <br />developed. <br /> <br />(B) A written statement including: <br /> <br />(1 ) The approximate date when construction will begin by stage of <br />development and the area of open space to be provided at each stage; <br /> <br />(2) Agreements, provisions or covenants which govern the use, maintenance <br />and continued protection of the development and any of its common open areas; and <br /> <br />(3) Other conditions specifically required by the Commission and the Council <br />for the particular PUD. <br /> <br />~ 154.256 ACTION ON FINAL APPLICATION. <br /> <br />(A) Procedure for action by the Planning and Zoning Commission and the Council <br />on an application for review and approval of the final plan for a PUD shall be the same as <br />prescribed by this subchapter for the action on the. preliminary proposal. In giving <br />approval, the Council may specify the length of time within which construction of the <br />project must be begun or completed, and it may attach other conditions as seem <br />necessary. The final development plan shall be in general conformance with the <br />preliminary development plan as approved. <br /> <br />(B) (1) Criteria for approval. The findings necessary for approval of both the <br />preliminary and final development plans shall be based on the following and describe in <br />what respect the plan would or would not be in the public interest. <br /> <br />(a) The plan does not conflict with the city comprehensive plan; <br /> <br />(b) The plan is designed to form a desirable and unified development <br />within its own boundaries; <br />