Laserfiche WebLink
<br />(4) The Council shall, within 30 days of the receipt of the report of the Planning <br />Commission, grant or deny the conditional use or refer the matter back to the Planning <br />Commission for further consideration. The Council shall not grant a conditional use <br />unless it finds that the standards of this Section have been satisfied. Any proposed <br />conditional use which fails to receive.the approval of the majority of the members of the <br />Planning Commission voting upon it shall not be approved except by a favorable vote of <br />four-fifths of all of the elected members of the Council. <br /> <br />(5) A Conditional Use Permit shall be valid for a period of one year, after <br />which the same shall be revoked in the event that any proposed construction, alteration or <br />operation has not been started in accordance with the terms of such permit. <br /> <br />(6) A Conditional Use Permit shall remain in effect as long as the conditions <br />agreed upon are observed, but nothing in this Chapter shall prevent the City from <br />enacting or amending official controls to change the status of conditional uses. <br /> <br />~~ 154.321 THROUGH 154.329 RESERVED FOR FUTURE EXPANSION. <br /> <br />~ 154.330 INTERIM USE PERMITS. <br /> <br />(A) Purpose. It is intended that the interim use permit procedures allow flexibility in <br />the use of land or structures in the city, when the uses are not permanent and when the <br />uses meet appropriate conditions and performance standards that protect the public <br />health, safety and welfare. <br /> <br />(B) Application, public hearing and procedure. The application, public hearing, <br />notice and procedure requirements for interim use permits shall be the same as those for <br />amendments, as provided in thid chapter. If a proposed interim use is not listed as a <br />permitted interim use in this chapter, a text amendment to this chapter will be required <br />before an interim use permit may be considered. <br /> <br />(C) Termination. All interim use permits shall terminate on the happening of any of <br />the following events, whichever first occurs: <br /> <br />(1) The date stated on the permit; <br /> <br />(2) Upon violation of the condition under which the permit was issued; or <br /> <br />(3) Upon change in the city's zoning regulations that renders the use <br />nonconforming. <br /> <br />(D) Standards. The interim use must specifically listed in the zoning district where <br />the property is located. The interim use must meet or exceed the performance standards <br />set forth in this chapter and other applicable city ordinances. The interim use must <br />