Laserfiche WebLink
Minimum Control Measure 5: Post - construction Stormwater Management in New Development <br /> and Redevelopment [V.G.5] ( *Required fields) <br /> The permit requires each permittee to develop, implement, and enforce a program to address stormwater runoff from new <br /> development and redevelopment projects within your jurisdiction that disturb an area greater than or equal to one acre, including <br /> projects less than one acre that are part of a larger common plan of development or sale that discharge into your small MS4. Your <br /> program must ensure that controls are in place that would prevent or reduce water quality impacts. You must also select and <br /> implement a program of appropriate BMPs and measurable goals for this minimum control measure. <br /> Note: The MS4 permit requirements associated with this minimum control measure were required to be fully developed and <br /> implemented by June 30, 2008. <br /> A. *Have you established design standards for stormwater treatment BMPs installed as a result of ['Yes ❑ No <br /> post- construction requirements? <br /> B. *Have you developed procedures for site plan review which incorporate consideration of water ❑ Yes P No <br /> quality impacts? <br /> C. *How many projects have you reviewed during the reporting period to ensure adequate long -term <br /> operation and maintenance of permanent stormwater treatment BMPs installed as a result of <br /> post- construction requirements? [Part V.G.5.b.and Part V.G.5.c]. <br /> D. *Do plan reviewers use a checklist when reviewing plans? ❑ Yes J! No <br /> E. *How are you funding the long -term operation and maintenance of your stormwater management <br /> system? (Check all that apply) <br /> ❑ Grants �IStormwater utility fee ❑ Taxes ❑ Other: <br /> Minimum Control Measure 6: Pollution Prevention /Good Housekeeping for Municipal <br /> Operations [V.G.6] ("Required fields) <br /> The permit requires each MS4 to develop and implement an operation and maintenance program that includes a training <br /> component and has the ultimate goal of preventing or reducing pollutant runoff from municipal operations. Your program must <br /> include employee training to prevent and reduce stormwater pollution from activities, such as park and open space maintenance, <br /> fleet and building maintenance, new construction and land disturbances, and stormwater system maintenance. <br /> A. *Indicate the total number of structural pollution control devices (for example -grit chambers, sumps, <br /> floatable skimmers, etc.) within your MS4, the total number that were inspected during the <br /> reporting period, and calculate the percent inspected. Enter "0" if your MS4 does not contain <br /> structural pollution control devices or none were inspected. Enter "NA" if the data does not exist: <br /> *Total number *Number inspected I 'Percentage <br /> *Structural pollution control devices: F i I / & <br /> B. *Did you repair, replace, or maintain any structural pollution control devices? ❑ Yes ❑ No <br /> C. *For each BMP below, indicate the total number within your MS4, how many of each BMP type <br /> were inspected and the percent inspected during the reporting period. Enter "0" if your MS4 <br /> does not contain BMPs or none were inspected. Enter "NA" if the data does not exist: <br /> Structure /Facilit t e *Total number *Number inspected *Per centage <br /> *Outfalls to receiving waters: j 0J <br /> *Sediment basins/ ponds. 571 6y <br /> *Total L -f { <br /> D. Of the BMPs inspected in C. above, did you include any privately owned BMPs in that number? ❑ Yes Eq No <br /> E. If yes in D. above, how many: <br /> Section 7: Impaired Waters Review ( *Required fields) <br /> The permit requires any MS4 that discharges to a Water of the State, which appears on the current U. S. Environmental Protection <br /> Agency (EPA) approved list of impaired waters under Section 303(d) of the Clean Water Act, review whether changes to the <br /> SWPPP may be warranted to reduce the impact of your discharge [Part IV.D]. <br /> A. *Does your MS4 discharge to any waters listed as impaired on the state 303 (d) list? ENYes ❑ No <br /> B. *Have you modified your SWPPP in response to an approved Total Maximum Daily Load (TMDL)? ❑ Yes ,&No <br /> If yes, indicate for which TMDL: <br /> www.pca.state.mn.us • 651 - 296 -6300 • 800 - 657 -3864 TTY 651 - 282 -5332 or 800 - 657 -3864 • Available in alternative formats <br /> wq- strm4 -06 • 112312013 Page 4 of 5 <br /> 5 <br />