Laserfiche WebLink
• Insurance includes all property, liability, crime, volunteer, vehicle, and monument <br /> sign coverage. <br /> • Office supply line item includes all office supplies, and maintenance contracts on <br /> printers and copiers. <br /> • Telephone /Internet/Web Hosting costs reflect website maintenance contract, <br /> telephone costs, the annual phone software upgrade, and costs associated with <br /> video streaming and video on demand services. <br /> • Postage and subscriptions covers the cost of mailing dubs, equipment for contract <br /> maintenance, magazines, newspapers, and other postage for the NMTC. <br /> • Property tax is for the recycling assessment. <br /> • The Commission no longer utilizes the Senior Community Service Employment <br /> program for our cleaning service. As such, funds for a cleaning service are included. <br /> Capital Expenditures <br /> • The 2014 capital budget includes motion graphics and replay equipment for the <br /> truck, energy efficient LED lights for the studio, HD camera equipment for staff and <br /> public departments, master control CG and server upgrades, and a ULive remote <br /> video transmission system. All equipment purchases are SD /HD capable and are <br /> necessary to meet our goals of maintaining the integrity and safety of our equipment, <br /> and moving to a tapeless, HD environment. <br /> • Office equipment includes routine computer and software upgrades for office <br /> computers. <br /> • The parking lot is cracking and needs to be repaired, resurfaced, and repainted. <br /> • The building bond payment is included under capital expenditures, and represents <br /> $185,638 of the capital budget. <br /> Summary <br /> • Operating expenses have been budgeted $37,558 higher than in 2013. The increase <br /> can be attributed to a 2% salary increase, benefit allotment increase, the addition of <br /> a 20 hour per week part -time assistant position, the expectation that there will be <br /> heightened interest in attending the NATOA conference, and for a redesign of the <br /> website to make access to programs easier, and to make HD programs available to <br /> viewers on- demand. This is a 3.5% increase over the 2013 operating budget. <br /> • The capital equipment budget is $6,855 less than in 2013. All purchases will replace <br /> or supplement current equipment and move us toward the HD format. Money has <br /> been budgeted for parking lot repairs and a $3,200 increase in the building bond <br /> payment. A little over half of the equipment expenditures will be paid for by drawing <br /> upon the equipment reserves. <br /> The total budget is $30,703 higher than the 2013 budget, a 2% increase. <br /> P. 6 <br /> 15 <br />