Laserfiche WebLink
CITY OF CENTERVILLE <br /> r to ryiffe MONTHL Y ENGINEER'S REPORT <br /> For the July 10, 2013 City Council Meeting <br /> Italics = New information. <br /> Normal = No change from last report. <br /> 1. 2008 Downtown Storm Water Improvements (000616- 08167 -0). A record plan of the project <br /> is being produced. A review of the pumping records from last year revealed that we need to have the <br /> sprinklers running for a longer duration each morning. Adjustments to the run -times on each sprinkler <br /> have been made taking into account the spray range of each individual gun. This will help maximize <br /> our potential irrigation volume. Obviously, this year, we have had so much rain, that we have not been <br /> able to operate the sprinkler system until recently. <br /> 2. 2013 Street and Utility Improvements (193801520). Construction of the water main and <br /> services is nearly complete at the time of this report. Prep work for curb and gutter, along with street <br /> paving is set for the Week of July e. <br /> About three quarters of the homes in the Center Street Project Area have now signed up to have their <br /> water service installed with the project. <br /> 3. CSAH 21 Reconstruction (193801639). The city and county continue to have good dialogue on <br /> various issues including design responsibility, schedule, cost sharing and design elements. A technical <br /> advisory panel meeting is scheduled for July 12` At some point in the near future, the city will need to <br /> make decisions on what elements of the project they want to have included in the bid: sidewalks, curb <br /> and gutter, large storm pipe, etc. <br /> 4. Mound Trail Water Main (193801873). After an agreement with the County was reached on cost <br /> sharing, the project moved forward, extending water main to the city limits at the end of Mound Trail. <br /> Construction is mostly complete. <br /> 5. 2014 Street and Utility Improvements (193801941). Preliminary discussions on possible streets <br /> to be addressed in 2014 have begun. The city council was shown this proposal as part of the last <br /> budget workshop. Additionally, it is anticipated that the Community Development Block Grant for the <br /> Robin Lane area will allow that portion of the streets and utilities to be included in the 2014 project. <br />