My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-14 Agenda
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2013
>
2013-08-14 Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2017 10:01:58 AM
Creation date
8/12/2013 8:52:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF CENTERVILLE <br />t MONTHI Y ENG-MEER'S REPORT <br />For the August 14, 2013 City Council Meeting <br />.italics = New information. <br />Normal = No change from last report. <br />1. 2008 Downtown Storm Water Improvements (000616-08167-0). A record plan of the project <br />is being produced. The sprinkler system has been running on its new adjusted run-times for each zone, <br />maximizing efficiency. Pumping records will be reviewed at the end of the year to judge our total <br />treatment volume. <br />2. 2013 Street and Utility Improvements (193801520). All base course paving has been <br />completed. At the time of this report, driveways, structure adjustments and restoration behind the curb <br />are all underway. Once all restoration items have been completed, the wear course paving in the north <br />area will take place. <br />The contractor is still working on making connections inside the home for those who have chosen to <br />hook to city water. <br />3. CSAR 21 Reconstruction (193801639). The next public open house is scheduled for September <br />24th, from 4 to 7 PM. At some point in the near future, the city will need to make decisions on what <br />elements of the project they want to have included in the bid, • sidewalks, curb and gutter, large storm <br />pipe, etc. <br />A proposal for engineering services related to the CSAH 21 reconstruction is included in this meeting's <br />agenda, <br />4. Mound Trail Water Main (193801873). Construction is complete <br />5. 2014 Street and Utility Improvements (193801941). Streets to be included in the 2014 Street <br />project have been discussed during our budget workshops. With the approval of the budget at this <br />meeting, we will need to finalize that list and make decisions on whether or not to assess those <br />improvements. <br />The grant for the Robin Lane area watermaln has been confirmed. We are working through various <br />scenarios for the placement of the watermain and how it relates to any necessary street work in the <br />area. Rough cost estimates for these options will be presented at this meeting. <br />97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.