Laserfiche WebLink
STANDARD FORM OF AGREEMENT <br />THE CITY OF CENTERVILLE <br />THIS AGREEMENT is by and between City of Centerville, Minnesota (hereinafter referred to <br />as the "City") and Capra's Utilities, Inc. (hereinafter referred to as the "Contractor"). City and <br />Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1. The Agreement <br />1.1. Contractor shall complete all work as specified in the following Contract Document: <br />I.I.I. This Agreement. <br />1.1.2. The Proposals dated 10/24/2012. (conformed copy) <br />1.2. After being reduced to writing and signed by the Contractor and the City certain documents can <br />become Contract Documents, and are incorporated into this Agreement by reference. These are <br />documents which may be delivered or issued on or after the Effective Date of the Agreement <br />and are not attached hereto. These documents can include: <br />1.2.1. Contract Bonds <br />1.2.2. Insurance Certificate <br />1.2.3. Notice to Proceed <br />1.2.4, Work Change Directives <br />1.2.5. Change Order(s) <br />1.3. These are all of the documents which form this Agreement. No verbal agreements exist outside <br />of the Contract Documents, and nothing shall modify the terms of this Agreement unless the <br />modification is in writing and signed by all parties. <br />ARTICLE 2. The Project <br />2.1. The Project for which the work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Connect the home at 6892 to City Watermain and Sanitary Sewer, <br />ARTICLE 3. The Engineer <br />3.1. The Project will be monitored by Paul Palzer, Public Works Director(hereinafter referred to as <br />"Engineer"), who is to act as City's representative, assume all duties and responsibilities, and <br />will have the rights and authority assigned to Engineer in the Contract Documents in connection <br />with the completion of the work in accordance with the Contract Documents. <br />ARTICLE 4. Deadlines <br />4.1. Dates for Substantial Completion and Final Payment <br />4.1.1. The work will be completed and ready for Final Payment on or before September 30. <br />2013. <br />4.2. Liquidated Damages <br />4.2.1. City and Contractor agree that as Liquidated Damages for delay (but not as a penalty); <br />Contractor shall pay City $150 for each day that expires after the time specified in <br />Paragraph 4.1. <br />AGREEMENT BETWEEN CITY OF CENTERVILLE AND <br />Capra Utilities, Inc. <br />PAGE NO. 1 of 4 <br />25 <br />