My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-14 Agenda
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2013
>
2013-08-14 Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2017 10:01:58 AM
Creation date
8/12/2013 8:52:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council 2013-07-24 7:05 p.m. <br />Minutes of Work Session <br />Present were Mayor Tom Wilharber, Council members Jeff Paar, Steve King, and Ben <br />Fehrenbacher. Absent was Council member D Love. <br />Staffing issues. Administrator Larson reported that approximately ten applications were <br />received for Finance Director. Before moving further, he asked for feedback on whether <br />the position should be filled or whether the City would be better served by outsourcing <br />major elements of the job to a consultant. An initial proposal was received from Joe <br />Rigdon at Kern, DeWenter, Viere, LTD, CPA's. The cost for 30 hours per month would <br />be about $4000 per month or $48,000 per year. Total costs for a full-time Finance <br />Director exceed $100,000 per year. Consensus was to not fill the full-time position at this <br />time, but use consultant services for the time being. <br />Larson reported that there is now some difficulty in scheduling time off with the smaller <br />staff currently in place. One option might be to hire a part time reception staff person for <br />a day or two per week to cover the front counter. The fourth person in the schedule makes <br />a lot of difference in covering the vacations and other leave time. Another option <br />considered would be to reduce the office schedule to four days per week. Scheduling <br />would likely be easier with four days open per week, but the office would open ten hours <br />per day. No consensus on this issue. <br />Budget. Administrator briefly reviewed the budget, noting a few points for discussion. <br />The Fire and Police estimated planned amounts are at or below what is expected in the <br />budget for each. Centennial Fire District is proposing a budget with virtually the same <br />cost as 2013, the preliminary budget anticipated up to 3% increase. The Centennial <br />Lakes Police budget hasn't been decided by the Governing Board, but the worst case <br />option is less than the 3% estimate put in the preliminary city budget. Larson noted that <br />the city phone system which is 13 years old, while not specifically budgeted in 2014 for <br />replacement, may need to be a planned expense. The monthly phone service cost would <br />be lower by contracting service with Roseville I -Net, but an initial expenditure of <br />approximately $4000 would be needed for equipment. This would cover both City Hall <br />and Public Works. This expense could be accommodated in the planned budget. <br />Budget status. It was noted that the Council may want one more work session in August <br />to finalize plans for the street maintenance and improvement program, before the <br />preliminary budget must be adopted on Sept. 11 <br />Budgeted Bond Levy-Backage Road/Commerce Drive. Administrator Larson reviewed <br />the Backage Road/Commerce Drive project and the cash-flow associated with the bonds <br />for the project. The project originally anticipated the sale of the city land along <br />
The URL can be used to link to this page
Your browser does not support the video tag.