Laserfiche WebLink
Contract Unit Current Quantity Amount <br /> No. Item Unit Quantity Price Quantity to Date to Date <br /> 62 1" WATER SERVICE DIRECTIONAL DRILLED - CURB STOP <br /> TO HOME LF 630 50.23 2010 2010 $100,962.30 <br /> 63 INSULATION, 4" THICK SY 290 38.82 5.4 275.4 $10,691.03 <br /> TOTAL PART 1B: CENTER OAKS 2 AREA STREET IMPROVEMENTS $311,364.10 <br /> PART 1C: CENTER OAKS 2 AREA STREET IMPROVEMENTS <br /> 64 LIFT STATION MODIFICATIONS LS 1 8797.50 0.65 0.65 $5,718.38 <br /> TOTAL PART 1C: CENTER OAKS 2 AREA STREET IMPROVEMENTS $5,718.38 <br /> PART 2: CENTERVILLE HEIGHTS AREA STREET IMPROVEMENTS <br /> 65 MOBILIZATION LS 1 10036.24 1 1 $10,036.24 <br /> 66 TRAFFIC CONTROL LS 1 1176.00 1 1 $1,176.00 <br /> 67 REMOVE BITUMINOUS PAVEMENT SY 10270 3.14 9250 9250 $29,045.00 <br /> 68 ADJUST EXISTING VALVE BOX EA 11 235.00 8 8 $1,880.00 <br /> 69 ADJUST EXISTING SANITARY SEWER MANHOLE CASTING <br /> AND RINGS EA 13 300.00 13 13 $3,900.00 <br /> 70 ADJUST EXISTING CATCH BASIN CASTING AND RINGS EA 10 150.00 9 9 $1,350.00 <br /> 71 EXTERNAL MANHOLE SEAL EA 23 236.53 13 13 $3,074.89 <br /> 72 MILL BITUMINOUS CONSTRUCTION JOINT LF 200 2.40 $0.00 <br /> 73 <br /> CONNECT DRAINTILE TO EXISTING STORM STRUCTURE EA 8 125.00 6 6 $750.00 <br /> 74 4" PERFORATED POLYETHYLENE DRAINTILE PIPE WITH <br /> SOCK WRAP LF 1000 2.19 1000 1000 $2,190.00 <br /> 75 COMMON EXCAVATION (EV) - STORM SEWER CROSSINGS CY 2850 15.44 567 567 $8,754.48 <br /> 76 SELECT GRANULAR BORROW (CV) CY 462 12.25 370 370 $4,532.50 <br /> 77 AGGREGATE BASE, CLASS 5 TN 1993 10.12 $0.00 <br /> 78 TYPE LV 3 NON WEARING COURSE MIXTURE (B) TN 1314 62.09 1338 1338 $83,076.42 <br /> 79 TYPE LV 3 WEARING COURSE MIXTURE (B) - 2013 TN 985 65.18 $0.00 <br /> 80 BITUMINOUS MATERIAL FOR TACK COAT - 2013 GAL 831 2.93 100 100 $293.00 <br /> 81 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 790 26.11 687 687 $17,937.57 <br /> 82 SAW AND SEAL TRANSVERSE JOINTS IN BITUMINOUS <br /> WEAR - 2013 LF 2218 3.66 $0.00 <br /> 83 STREET SWEEPER (PICKUP BROOM W /OPERATOR) HR 10 125.00 2 2 $250.00 <br /> TOTAL PART 2: CENTERVILLE HEIGHTS AREA STREET IMPROVEMENTS $168,246.10 <br /> PART 3: OFF PROJECT SERVICE CONNECTIONS <br /> 84 CONNECT WATER SERVICE TO EXISTING PLUMBING <br /> INSIDE HOME EA 29 879.38 6 6 $5,276.28 <br /> 85 1" WATER SERVICE DIRECTIONAL DRILLED - CURB STOP <br /> TO HOME LF 1450 50.23 526 526 $26,420.98 <br /> TOTAL PART 3: OFF PROJECT SERVICE CONNECTIONS $31,697.26 <br /> CHANGE ORDER NO. 1 <br /> 1 ROCK USED FOR TEMPORARY RESIDENT ACCESS TN 405.51 13.50 455.51 $6,149.39 <br /> 2 2'X 3' CATCHBASIN EA 2 1343.00 1 $1,343.00 <br /> 3 4' DIA. CATCHBASIN MANHOLE EA 2 1583.00 2 $3,166.00 <br /> 4 4' DIA. CATCHBASIN MANHOLE, WITHOUT CASTING <br /> (EXISTING TO BE SALVAGED) EA 1 1219.00 1 $1,219.00 <br /> TOTAL CHANGE ORDER NO. 1 $11,877.39 <br /> TOTAL PART 1A: CENTER OAKS 2 AREA STREET IMPROVEMENTS $640,012.17 <br /> TOTAL PART 1B: CENTER OAKS 2 AREA STREET IMPROVEMENTS $311,364.10 <br /> TOTAL PART 1C: CENTER OAKS 2 AREA STREET IMPROVEMENTS $5,718.38 <br /> TOTAL PART 2: CENTERVILLE HEIGHTS AREA STREET IMPROVEMENTS $168,246.10 <br /> TOTAL PART 3: OFF PROJECT SERVICE CONNECTIONS $31,697.26 <br /> TOTAL CHANGE ORDER NO. 1 $11,877.39 <br /> TOTAL WORK COMPLETED TO DATE $1,168,915.39 <br /> 193801520RE03 *m <br /> 16 <br />