Laserfiche WebLink
EXHIBIT D <br /> ELECTRICAL FEES <br /> Individual/separate inspection (installation, replacement, alteration or repair) ................. .........................$45.00 <br /> Services, generators, feeders to separate structures and other power supply resources. <br /> 1. 0 ampere to and including 200 ampere capacity . ............ .... .............. ..............$45.00 <br /> 2. Each additional 100 amps or fraction thereof ................ ............................... an add'l $10 00 <br /> 3. For services and circuits operating at over 250 volts ....... . ......... (Scheduled fee doubles) <br /> Circuits, feeders, feeder taps, or sets of transformer secondary conductors. <br /> 1. 0 ampere to and including 30 ampere capacity ....... ............................... ..........................$8.00 <br /> 1 31 amps to 100 amps ............. ................................................... ............................... $10.00 ea. <br /> 3. Each additional 100 amps ................... ............................... .......................... an add'] $5 00 <br /> One -Family dwelling and each dwelling unit of a two- family dwelling ................. ............................... $175.00 <br /> Up to and including 200 amps service (includes not more than three inspections) <br /> Multifamilydwellings ..................... ............................... ............................. ........ ........................$100.00 <br /> Each existing circuits or feeders reconnected to replacement panels (new or extended circuits or feeders at the <br /> abovefees) . . ................ ... I .......... .............................. ......... .. ........................ I ..... .. .......... ..............$3.00 <br /> Electrical supply for each manufactured home park lot ........................................ ............................... $45.00 <br /> Recreational vehicle site, electrical supply equipment ........ ............................... .............................. $10.00 ea. <br /> Street, parking lot or outdoor area lighting standards ............................ ............................... $8.00 <br /> Transformers for light, heat and power: <br /> 1. Up to and including 10 kilo -volt amps . ............................... .. ............................ $20.00 ea. <br /> 2 Over 10 kilo -volt amps ........................................................... ............................... $40.00 ea. <br /> Transformers and electronic power supplies for electric signs and outlme lighting ........ ..........................$8.00 <br /> Swimming pool bonding inspection (each separate inspection) ...... ........................ ............................$45 00 <br /> (Bonding conductors and connections require an inspection before being concealed) <br /> Retrofit modifications to existing lighting fixtures .............. ... ..... .. .... .. ..... . ... ................ .. ........... ..$.50 /fixture <br /> Transient Projects - Power supply fees as identified above, plus 1 hour .......... ............................... $90.00/hour <br /> Each attraction or concession inspection ........................................... ............................... .........................$45.00 <br /> Special inspection or inspections not covered above the fee is $90.00 per hour plus mileage at the rate <br /> established per the IRS. <br /> Re- inspection fee when inspection is necessary to determine whether the unsafe conditions have been corrected <br /> — a fee will be assessed by the inspector ................................................ ............................... .........................$45.00 <br /> MmunumFee per Trip ............................................................................ ............................... .........................$45.00 <br /> *Electrical work commenced without filing the required permit, in addition to the permit fee, shall pay two <br /> times the permit fee, not to exceed $1,000. *For purposes of interpretation, Minnesota Rules, Chapter 3800, <br /> Page 13 of 17 <br /> P23 <br />