Laserfiche WebLink
EXHIBIT E <br /> LANDFILL, GRADING AND EXCAVATING PERMIT FEES <br /> GRADING FEES <br /> General. Fees shall be assessed in accordance with the provisions of this section or shall be as set forth <br /> in the fee schedule adopted by the jurisdiction. <br /> Plan Review Fees When a plan or other data are required to be submitted, a plan review fee shall be <br /> paid at the time of submitting plans and specifications for review. Said plan review fee shall be set forth in <br /> Table A33 -A. Separate plan review fees shall apply to retaining walls or mayor drainage structures as required <br /> elsewhere in this code. For excavation and fill on the same site, the fee shall be based on the volume of <br /> excavation or fill, whichever is greater <br /> Grading Permit Fees. A fee for each gradmg permit shall be paid to the City as set forth in Table A33 -13. <br /> Separate permits and fees shall apply to retaining walls or major drainage structures as required elsewhere in <br /> this code There shall be no separate charge for standard terrace drains and similar facilities. <br /> TABLE A33 -A GRADING PLAN REVIEW FEES <br /> 50 cubic yards (38.2 m3) or less .... ............................... ............... .............................No Fee <br /> 51 to 100 cubic yards (40 m3 to 76.5 m3) ........ .............. ............................... ...............$37.01 <br /> 101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) ........................ ............................... $58.28 <br /> 1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3 ) ............................. .........................$77.57 <br /> 10,001 to 100,000 cubic yards (7646.3 to 7645.5 m3) - $77.57 for the first <br /> 10,000 cubic yards (7645.5 m3), plus $38.59 for each additional <br /> 10,000 cubic yards (7645.5 m3) or fraction thereof. <br /> 100,001 to 200,000 cubic yards (7645.6 m3 to 15,291.1 m3) - $424.86 for the <br /> first 100,000 cubic yards (7645.5 m3), plus $20.87 for each additional <br /> 10,000 cubic yards (7645.5 m3) or fraction thereof. <br /> 200,001 cubic yards (15,291.2 m3) or more - $633 55 for the first -S200,000 cubic <br /> yards (15,291 1 m3), plus $11 42 for each additional 10,000 cubic years <br /> (7645.5 m3) or fraction thereof. <br /> Other Fees <br /> Additional plan review required by changes, additions or revisions to approved plans <br /> (minimum charge - one -half hour) .................................................... ............................... $79.54 per hour* <br /> *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, <br /> overhead, equipment, hourly wages and fringe benefits of the employees involved <br /> TABLE A33B - GRADING PERMIT FEES <br /> 0 to 100 cubic yards (40 m3 to 76.5 m3) ......................................... ............................... $60.00 <br /> 101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) - $60.00 for the first 100 cubic yards <br /> (76.5 m3), plus $27.56 for each additional 100 cubic yards (76.5 m3) or fraction <br /> thereof. <br /> 1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3) - $308.04 for the first 1,000 <br /> cubic yards (764.6 m3), plus $22.84 for each additional 1,000 cubic yards <br /> (764.6 m3) or fraction thereof. <br /> 10,001 to 100,000 cubic yards (7,646.3 m3 to 7,645.5 m3) - $513.60 for the first 10,000 <br /> cubic yards (7,645.5 m3), plus $103.95 for each additional 10,000 cubic yards <br /> (7,645.5 m3) or fraction thereof. <br /> 100,001 cubic yards (7,645.6 m3) or more - $1,449.15 for the first 100,000 cubic yards <br /> (7,645.5 m3), plus $57.49 for each additional 10,000 cubic yards (7,645.5 m3) <br /> Page 15 of 17 <br /> P25 <br />