My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2013
>
2013-10-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2013 3:42:31 PM
Creation date
10/4/2013 3:39:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br /> ELECTRICAL FEES <br /> Individual/separate inspection (installation, replacement, alteration or repair) ................. .........................$45.00 <br /> Services, generators, feeders to separate structures and other power supply resources: <br /> 1. 0 ampere to and including 200 ampere capacity . ............................... .........................$45.00 <br /> 2. Each additional 100 amps or fraction thereof ............. ........................... an add'I $10 00 <br /> 3. For services and circuits operating at over 250 volts ....................(Scheduled fee doubles) <br /> Circuits, feeders, feeder taps, or sets of transformer secondary conductors: <br /> 1. 0 ampere to and including 30 ampere capacity ........ ......................... .................$8.00 <br /> 2. 31 amps to 100 amps .. ............................... ...................... .......................... $10.00 ea <br /> 3. Each additional 100 amps ........ .................................. ............................... an add'I $5 00 <br /> One - Family dwelling and each dwelling unit of a two - family dwelling... .. ................... ........................$175.00 <br /> Up to and including 200 amps service (includes not more than three inspections) <br /> Multifamily dwellings ..................................... ............................... ..........$100.00 <br /> ...... ............................... . <br /> Each existing circuits or feeders reconnected to replacement panels (new or extended circuits or feeders at the <br /> abovefees) ................. ............................... .............................. ................ ..........................$3.00 <br /> Electrical supply for each manufactured home park lot ............... ............................... .. .........................$45.00 <br /> Recreational vehicle site, electrical supply equipment ............ ............................ ............................... $10.00 ea. <br /> Street, parking lot or outdoor area lighting standards .. .. ..... .................. . ... . . ..........................$8.00 <br /> Transformers for light, heat and power: <br /> 1 Up to and including 10 kilo -volt amps ................................... ............................... $20.00 ea. <br /> 2. Over 10 kilo -volt amps ...... ............................... ........... ............................... $40.00 ea. <br /> Transformers and electronic power supplies for electric signs and outline lighting . ............................... $8.00 <br /> Swimming pool bonding inspection (each separate inspection) . .... ............................... .... ................$45.00 <br /> (Bonding conductors and connections require an inspection before being concealed) <br /> Retrofit modifications to existing lighting fixtures ............................................ ............................... $.50 /fixture <br /> Transient Projects - Power supply fees as identified above, plus 1 hour .... ..... ............................... $90.00/hour <br /> Each attraction or concession inspection .............................................................. ............................... $45.00 <br /> Special inspection or inspections not covered above the fee is $90.00 per hour plus mileage at the rate <br /> established per the IRS. <br /> Re- inspection fee when inspection is necessary to determine whether the unsafe conditions have been corrected <br /> — a fee will be assessed by the inspector ................................................. ............................... .........................$45.00 <br /> MinimumFee per Trip ............................................................................... ............................... .........................$45.00 <br /> *Electrical work commenced without filing the required permit, in addition to the permit fee, shall pay two <br /> times the permit fee, not to exceed $1,000. *For purposes of interpretation, Minnesota Rules, Chapter 3800, <br /> Page 13 of 17 <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.