Laserfiche WebLink
CENTERVILLE ROAD (CSAH 21) PROJECT <br /> City of Centerville Sources and Uses of Funds Statement <br /> Source: <br /> General Fund $ 200,000 Per Mike's recommendation at budget workshop <br /> Water Fund $ 175,000 Per Mike's recommendation at budget workshop <br /> Sewer Fund $ 175,000 $ 550,000 Per Mike's recommendation at budget workshop <br /> Stormwater Fund $ 50,000 <br /> General Fund for Contingency $ 25,000 <br /> Reimbursement Trail Grant 50% $ 28,757 <br /> Total Funds $ 653,757 <br /> Uses: Benefits <br /> Trail along east side of roadway. $ 53,254 1. Safer for users than biking or walking on roadway <br /> 2. Half paid by Metro Council, if trail an not sidewalk. <br /> 3. Anoka County paying for ROW acquisition <br /> West Side Storm (42 inch and Larger) $ 264,344 1. Makes development of downtown possible without <br /> stormwater BMP's for each parcel. <br /> 2. Land that would have been used for ponds and other <br /> stormwater facilities can be used for development. <br /> 3. Anoka County pays for 25% of cost if done with roadway. <br /> 4. Storm system in place ahead of development proposal <br /> East Side Storm Sewer (30 inch and larger) $ 62,947 1. Deep ditch will be elliminated on east side of the road <br /> near Center Street. <br /> 2. Drainage from neighborhoods east of Centerville road will <br /> be more stable if we don't have the silting concerns of a <br /> ditch along Centerville Road. <br /> 3. Anoka County pays 25% of the installation cost. <br /> Other Costs: <br /> Curb and Gutter /Other Storm Sewer $ 115,488 1. 50% of curb and 25% of Storm by Anoka County, <br /> Construction Engineering $ 41,619 <br /> Mobilization and Traffic Control $ 24,205 <br /> Total Project Costs $ 561,857 <br /> * ** Costs are based upon engineer's estimate and could change at bidding. Sources of funds have about $90,000 to cover added costs. <br /> * * * * ** This schedule does not include any costs for installation of new, repaired or relocated sewer and water mains or hydrants. <br /> Those costs would be paid from the appropriate enterprise fund. <br /> * * * * * * ** Does not include Stantec engineering cost for city. <br />