Laserfiche WebLink
Bidder No. 1 Bidder No. 2 Bidder No. 3 Bidder No. 4 <br /> BID TABULATION C & L Excavating, Inc. GM Contracting, Inc. Northdale Const. Co., Inc. Penn Contracting, Inc. <br /> Item <br /> Num Item Units Qty Unit Price Total Unit Price Total Unit Price Total Unit Price Total <br /> 28 FURNISH AND INSTALL TYPESPWEB340E WEARING COURSE MIXTURE TN 60 $6,96000 $10,80000 $13,80600 $15,90000 <br /> (B) - STREET PATCHING $11600 $18000 <br /> $23010 $265.00 <br /> 29 FURNISH AND INSTALL BITUMINOUS MATERIAL FOR TACK COAT GAL 31 $15500 $31000 $365.80 $248.00 <br /> $500 $1000 $11.80 $8.00 <br /> 30 FURNISH AND INSTALL SURMOUNTABLE CONCRETE CURB AND LF 55 $1,595.00 $1,54000 $1,81720 $2,090.00 <br /> GUTTER $2900 $2800 <br /> $3304 $3800 <br /> 31 FURNISH AND INSTALL 8618 CONCRETE CURB AND GUTTER LF 115 $3300 $3,79500 $3200 $3,680.00 $3304 $3,79960 $4400 $5,060.00 <br /> 32 ADJUST MH CASTING EA 1 $40000 $40000 $45000 $45000 $50000 $50000 $55000 $55000 <br /> 33 FURNISH AND INSTALL TOPSOIL BORROW (LV) CY 610 $2200 $13,42000 $23.50 $14,335.00 $3500 $21,350.00 $12.00 $7,32000 <br /> 34 FURNISH AND INSTALL SODDING, LAWN TYPE SY 2870 $550 $15,785.00 $6.00 $17,22000 <br /> $616 $17,679.20 $8.00 $22,960.00 <br /> 35 FURNISH AND INSTALL CATCH BASIN PROTECTION EA 5 $22500 $1,125.00 $17500 $87500 $200.00 $1,00000 $250.00 $1,25000 <br /> 36 STREET SWEEPER (PICKUP BROOM W/OPERATOR) HR 10 $11500 $1,15000 $14600 $1,46000 $175.00 $1,75000 $200.00 $2,00000 <br /> TOTAL PART 1: ROYAL MEADOWS WATER MAIN IMPROVEMENTS $ 282, 901,80 $ 397 ,942.96 $456,933.32 $579,500.00 <br /> (LABOR) <br /> PART 2: OFF - PROJECT SERVICES (LABOR) <br /> 37 CONNECT WATER SERVICE TO EXISTING PLUMBING INSIDE HOME EA 3 $1,00000 $3,00000 $850.00 $2,55000 $3,50000 $10,50000 $1,100.00 $3,300.00 <br /> \ 38 INSTALL 1" HDPE WATER SERVICE DIRECTIONAL DRILLED - CURB LF 250 $3000 $7,50000 $5082 $12,705.00 $2367 $5,91750 $67.00 $16,75000 <br /> STOP TO HOME <br /> 39 CONNECT TO EXISTING CURB STOP EA 3 $1,40000 $4,20000 $1,500.00 $4,500.00 $2,50000 $7,500.00 $1,20000 $3,600.00 <br /> TOTAL PART 2: OFF - PROJECT SERVICES (LABOR) $14,700.00 $19,755.00 $23,917.50 $23,650.00 <br /> BID SUMMARY <br /> TOTAL PART 1. ROYAL MEADOWS WATER MAIN IMPROVEMENTS $282,901 80 $397,942.96 $456,93332 $579,50000 <br /> (LABOR) <br /> TOTALPART2 OFF - PROJECT SERVICES (LABOR) $14,700.00 $19,75500 $23,91750 $23,65000 <br /> TOTAL BASE BID: $ 297,601.80 $417,697.96 $480,850.82 $603,150.00 <br /> Contractor Name and Address. C & L Excavating, Inc. GM Contracting, Inc. Northdale Const Co, Inc Penn Contracting, Inc <br /> 7939 Ridgewood Road 19810 515th Avenue 9760 71st Street NE 13025 Central Avenue NE <br /> St Joseph, MN 56374 Lake Crystal, MN 56055 Albertville, MN 55301 Blaine, MN 55434 <br /> Phone. 320 -363 -1221 507- 726 -6433 763 -428 -4868 763- 767 -2141 <br /> Fax 320 -363 -8386 507- 726 -6399 763 -428 -4997 763 -767 -2545 <br /> Signed By: Kevin Cox Sue Harazin Thomas A Wilebski Dean Luxenburg <br /> Title: President President President President <br /> Bid Security Bid Bond Bid Bond Bid Bond Bid Bond <br /> Addenda Acknowledged: 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 <br /> email address kevin( clexcavatina com m tomw anorthdaleconst com penncontractina s msn com <br /> 1938024836T- LABOR.xism BT -2 <br />