My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-05 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2014
>
2014-03-05 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 9:30:12 AM
Creation date
2/27/2014 9:30:05 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The cost estimate for completion of this trail is $1,973,400. The cost breakdown is shown <br /> in Table 2. <br /> TABLE 2 <br /> Proposed Chain of Lakes -Bald Eagle Regional Trail <br /> Development Cost Estimate <br /> Description Total <br /> Right of Way /Easement Acquisition $294,000 <br /> Design /Engineering /Project $100,000 <br /> Management <br /> Archaeological Survey $50,000 <br /> Wetland Delineation $50,000 <br /> Topographic Survey /Construction $1oo,000 • <br /> Staking <br /> Geotechnical Survey $50,000 <br /> Clearing and grubbing $100 • <br /> Utility relocations, if required $100,000 <br /> Bituminous trail construction ($40 /LF) $635,000 • <br /> Trailhead Facility Development $100,000 <br /> Lighting $75,000 <br /> Landscaping and restoration $75,000 <br /> Signage and striping $40,000 <br /> Site Furnishings $25,000 <br /> Sub -Total $1,794,000 <br /> Contingency (10 %) $179,400 <br /> Total $1,973,400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.