Laserfiche WebLink
Project' 02029 -11 - LINO - 21st Avenue Extension Engineers Estimate A -1 Excavating, Inc. Latour Construction Arnt Construction Company <br /> Item No. Item Units Quantity Unit Price Total Price Unit Price ITotal Price Unit Price Total Price Unit Price Total Price <br /> 23 2511.5011 RANDOM RIPRAP CLASS III - GROUTED CU YD 30 $150.00 $4,500.00 $85.00 $2,550.00 $89.00 $2,670.00 $106.00 $3,180.00 <br /> 24 2511.515 GEOTEXTILE FABRIC TYPE III SQ YD 80 $5.00 $400.00 $7.00 $560.00 $2.70 $216.00 $4.00 $320.00 <br /> Total Storm Sewer Improvements $99,520.00 $88,550.00 $70,147.01 $82,150.00 <br /> Surface Improvements <br /> 25 2021.501 MOBILIZATION LUMP SUM 1 $25,800.00 $25,800.00 $11,500.00 $11,500.00 $14,800.00 $14,800.00 $26,000.00 $26,000.00 <br /> 26 2101.501 CLEARING ACRE 1.41 $3,50000 $4,935.00 $500.00 $705.00 $2,680.00 $3,778.80 $3,000.00 $4,230.00 <br /> 27 2101.506 GRUBBING ACRE 141 $3,000.00 $4,230.00 $500.00 $705.00 $1,442.00 $2,033.22 $1,000.00 $1,410.00 <br /> 28 2104.501 REMOVE CONCRETE CURB AND GUTTER LIN FT 240 $5.00 $1,200.00 $2.00 $480.00 $5.50 $1,320.00 $1.00 $240.00 <br /> 29 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 850 $500 $4,250.00 $1.00 $850.00 $2.40 $2,040.00 $1.60 $1,360.00 <br /> 30 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 170 $500 $850.001 $2.00 $340.00 $5.10 $867.00 $4.00 $680.00 <br /> 31 2105.501 COMMON EXCAVATION (P) CU YD 2500 $11.00 $27,500.00 $330 $8,250.00 $5.90 $14,750.00 $12.16 $30,400.00 <br /> 32 2105.507 SUBGRADE EXCAVATION CU YD 220 $13.00 $2,860.00 $3.80 $836.00 $6.70 $1,474.00 $12.16 $2,675.20 <br /> 33 2105.522 SELECT GRANULAR BORROW (CV) CU YD 3180 $12.00 $38,160.00 $1480 $47,064.00 $13.70 $43,566.00 $13.40 $42,612.00 <br /> 34 2105.523 COMMON BORROW (CV) CU YD 6000 $1000 $60,000.00 $11.70 $70,200.00 $12.60 $75,600.00 $11.32 $67,920.00 <br /> 35 2105.607 POND EXCAVATION (EV) CU YD 2100 $11.00 $23,100.00 $3.80 $7,980.00 $4.60 $9,660.00 $12.16 $25,536.00 <br /> 36 2112.501 ISUBGRADE PREPARATION ROAD STA 13 $200.00 $2,600.00 $75.00 $975.00 $412.00 $5,356.00 $200.00 $2,600.00 <br /> 37 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 20 $150.00 $3,000.00 $75.00 $1,500.00 $124.001 $2,480.00 $20.00 $400.00 <br /> 38 2130.501 WATER (DUST CONTROL) M GALLONS 10 $100.00 $1,000.00 $21.00 $210.00 $40.00 $400.00 $1.00 $10.00 <br /> 39 2211.501 AGGREGATE BASE CLASS 5 TON 4200 $15.00 $63,000.00 $13.00 $54,600.00 $12.00 $50,400.00 $9.90 $41,580.00 <br /> 40 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 420 $4.00 $1,680.00 $2.50 $1,05000 $4.10 $1,72200 $4.00 $1,680.00 00 <br /> 41 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (3,B) TON 940 $65.00 $61,100.00 $70.00 $65,80000 $69.80 $65,612.00 $70.00 $65,800.00 N <br /> 42 2360.502 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) TON 940 $65.00 $61,100.00 $70.00 $65,800.001 $67.00 $62,980.00 $68.00 $63,920.00 <br /> 43 2506.522 ADJUST FRAME & RING CASTING ( SANITARY) EACH 1 $500.00 $500.00 $175.00 $175.00 $480.001 $480.00 $610.00 $610.00 <br /> 44 2521.501 6" CONCRETE WALK SQ FT 1570 $6.00 $9,420.00 $5.25 $8,242.50 $5.90 $9,263.00 $6.28 $9,859.60 <br /> 45 2521.511 2.5" BITUMINOUS WALK SQ FT 8400 $4.001 $33,600.00 $2.20 $18,480.00 $3.00 $25,200.00 $2.26 $18,984.00 <br /> 46 2531.501 CONCRETE CURB & GUTTER DESIGN 8618 LIN FT 3300 $12.00 $39,600.00 $9.60 $31,680.00 $11.40 $37,620.00 $9.90 $32,670.00 <br /> 47 2531.602 CONCRETE MEDIAN NOSE DESIGN 7113 EACH 2 $500.00 $1,000.00 $325.00 $650.00 $460.00 $920.00 $474.00 $948.00 <br /> 48 2531.60417" CONCRETE VALLEY GUTTER SQ YD 20 $65.00 $1,300.00 $65.00 $1,300.00 $56.00 $1,120.00 $58.00 $1,160.00 <br /> 49 2531.618 TRUNCATED DOMES SQ FT 128 $35.00 $4,480.00 $35.00 $4,480.00 $31.001 $3,968.00 $32.00 $4,096.00 <br /> 50 2563.601 TRAFFIC CONTROL LUMP SUM 1 $500.00 $500.00 $1,500.00 $1,500.00 $1,400.00 $1,400.00 $1,400.00 $1,400.00 <br /> 51 2563.602 TYPE III BARRICADES EACH 14 $300.00 $4,200.00 $150.00 $2,100.00 $250.00 $3,500.00 $250.00 $3,500.00 <br /> 52 2564.531 SIGN PANELS TYPE C SQ FT 1 30 $50.00 $1,500.00 $35.001 $1,050.00 $33.00 $990.00 $32.50 $975.00 <br /> 53 2564.602 PAVEMENT MESSAGE (THRU ARROW) EPDXY EACH 2 $250.00 $500.00 $150.00 $300.00 $129.00 $258.00 $125.00 $250.00 <br /> 54 12564.6021 SALVAGE AND REINSTALL SIGN EACH 1 $100.00 $100.00 $100.00 $100.00 $103.00 $103.00 $100.00 $100.00 <br /> 55 12565.6161 REVISE SIGNAL SYSTEM SYS 1 $30,000.00 $30,000.00 $12,000.00 $12,000.00 $13,000.001 $13,000.001 $12,800.001 $12,800.00 <br /> Page 2 <br />