Laserfiche WebLink
CITY OF CENTERW LLE <br /> �termile <br /> MONTHL YENGINEER'S REPORT <br /> For the May 14, 2014 City Council Meeting <br /> L►Ianh�jt��f <br /> Italics=New information. <br /> Normal = No change from last report. <br /> 1. 2013 Street and Utility Improvements (193801520). Wear course paving is being discussed <br /> with the contractor. <br /> 2. Centerville Road (CSAH 21) Reconstruction (193801639). The project will be sent to MNDOT <br /> for review in mid-May. Easement acquisition is ongoing. Bidding is expected in the fall of 2014. <br /> The Council will need to decide on whether or not to extend city sewer and water south of Dupre Rd., <br /> to the city limits with this project. City staff has provided a summary of the issues and costs associated <br /> with this extension. <br /> 3. 2014 Street and Utility Improvements (193801941). The contracts for labor and materials have <br /> been awarded. City staff is working to complete preparatory work on the streets to be overlaid, <br /> including curb patching, structure adjustments and storm sewer repairs and additions. <br /> 4. Royal Meadows Water Main (193802483). The contracts for labor and materials have been <br /> awarded. A preconstruction meeting was held the week of April 2e. Construction should begin within <br /> the next few weeks. <br /> 5. 21s`Ave., North of Main St. (193802667). The project will extend city water to the north in order <br /> to service future commercial/retail development in the area. Sewer service immediately along 21St Ave. <br /> will come from Lino Lakes'facilities in 21'Avenue. Lino Lakes is administering this project. <br /> City staff met with Anoka County staff and a realtor for the landowner to discuss access to CSAH 14 <br /> (Main Street) and CSAH 21 (20th Avenue) for the vacant land in the northeast quadrant of Main Street <br /> and 20th Avenue. Some concept sketches were presented for an east-west connection through the area <br /> between 20th and 21St Avenues. <br /> 6. Miscellaneous(193801743). <br /> • Our water tower specialists have verified the post construction condition of the tower in <br /> conjunction with some antenna work being done by T-Mobile, The contractor, however, will be <br /> back to clean up the site which was severely rutted by their equipment. <br /> • We are working to put together a quote package for replacement of the concrete intersections <br /> with pavement on Main Street(CSAH 14). <br />