My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-28 Handouts @ Meeting
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2014
>
2014-05-28 Handouts @ Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2014 6:01:14 PM
Creation date
5/28/2014 6:01:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Owner: City of Centerville, 1880 Main St.,Centerville,MN 55038 Date May 22,2014 <br /> ®Stantec Contractor: C&L Excavating,Inc.,7939 Ridgewood Rd.,St.Joseph,MN 56374 <br /> Bond Company: Bond No: <br /> CONSTRUCTION CHANGE ORDER NO. 1 <br /> 2014 ROYAL MEADOWS WATERMAIN IMPROVEMENTS (LABOR BID) <br /> STANTEC PROJECT NO. 193802483 <br /> Description of Work <br /> This Change Order provides for additional work as follows: <br /> Item No 1 provides for additional manholes,frame adjustments and castings. <br /> Item No.2 provides for additional catchbasins,adjustments,and remove and replace all rings,and remove and replace <br /> 10'concrete curb each side of catchbasin,and install(2) No.4 steel reinforcing rods in the lower portion of the curb. <br /> Item No.3 provides for adjusting valve box (within 6'of mill area).This involves two (2) adjustments.First lower box for <br /> milling and then raise box to future pavement grade. <br /> Item No.4 provides for reconstruction of storm sewer on West Robin Lane to include 80 If of concrete curb and gutter. <br /> Item No.5 provides for remove and replace existing concrete curb and gutter. <br /> Contract Unit Total <br /> No. Item Unit Quantity Price Amount <br /> CHANGE ORDER NO.1 <br /> 1 MANHOLE,ADJUST FRAME AND CASTING EA 10 $500.00 $5,000.00 <br /> 2 CATCHBASIN-PER ABOVE DESCRIPTION EA 22 $1,200.00 $26,400.00 <br /> 3 ADJUST VALVE BOX-PER ABOVE DESCRIPTION EA 16 $450.00 $7,200.00 <br /> 4 RECONSTRUCT STORM SEWER PER ABOVE LS 1 $12,000.00 $12,000.00 <br /> DESCRIPTION <br /> 5 REMOVE AND REPLACE CONCRETE CURB AND LF 1065 $30.00 $31,950.00 <br /> GUTTER <br /> TOTAL CHANGE ORDER NO. 1: $82,550.00 <br /> 193802483CH01 xlsm <br />
The URL can be used to link to this page
Your browser does not support the video tag.