My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-09CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2014
>
2014-07-09CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2022 11:22:55 AM
Creation date
7/3/2014 3:40:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Identify the number of active construction sites greater than an acre in your jurisdiction during <br />the 2013 calendar year. 0 <br />E. *On average, how frequently are construction sites inspected (e.g., weekly, monthly, etc.)? weekly <br />F. *How many inspectors, at any time, did you have available to verify erosion and sediment control <br />compliance at construction sites during the reporting period? <br />Minimum Control Measure 5: Post -construction Stormwater Management in New Development <br />and Redevelopment [V.G.5] (*Required fields) <br />The permit requires each permittee to develop, implement, and enforce a program to address stormwater runoff from new <br />development and redevelopment projects within your jurisdiction that disturb an area greater than or equal to one acre, including <br />projects less than one acre that are part of a larger common plan of development or sale that discharge into your small IVIS4. Your <br />program must ensure that controls are in place that would prevent or reduce water quality impacts. You must also select and <br />implement a program of appropriate BMPs and measurable goals for this minimum control measure. <br />Note: The IVIS4 permit requirements associated with this minimum control measure were required to be fully developed and <br />implemented by June 30, 2008. <br />A. *Have you established design standards for stormwater treatment BIMPs installed as a result of Q Yes No <br />post -construction requirements? <br />B. *Have you developed procedures for site plan review which incorporate consideration of water Yes No <br />quality impacts? <br />C. *How many projects have you reviewed during the reporting period to ensure adequate long- <br />term operation and maintenance of permanent stormwater treatment BIVIPs installed as a result <br />of post -construction requirements? [Part V.G.5.b,and Part V.G.5.c]. <br />D. *Do plan reviewers use a checklist when reviewing plans? 0 Yes Pg No <br />E. 'How are you funding the long-term operation and maintenance of your stormwater <br />management system? (Check all that apply) <br />F-I Grants El Stormwater utility fee El Taxes <br />C] Other: <br />Minimum Control Measure 6: Pollution Prevention/Good Housekeeping for Municipal <br />Operations [V.G.6] (*Required fields) <br />The permit requires each permittee to develop and implement an operation and maintenance program that includes a training <br />component and has the ultimate goal of preventing or reducing pollutant runoff from municipal operations. Your program must <br />include employee training to prevent and reduce stormwater pollution from activities, such as park and open space maintenance <br />fleet and building maintenance, new construction and land disturbances, and stormwater system maintenance. <br />A. *The permit requires each permittee to inspect annually all structural pollution control devices, <br />such as trap manholes, grit chambers, sumps, floatable skimmers and traps, separators, and <br />other small settling or filtering devices [Part V.G,6.b.2)) <br />B. *Did you inspect all structural pollution control devices during the reporting period? <br />C. *Have you developed an alternate inspection frequency for any structural pollution control <br />devices? [V.G.6.b,7)1 <br />*Indicate the total number of structural pollution control devices for which you have developed <br />and alternative inspection tirequency. <br />D. Indicate the total number of structural pollution control devices (for example -grit chambers, <br />sumps, floatable skimmers, etc.) within: your IMS4, the total number that were inspected during <br />the reporting period, and' calculate the percent inspected. Enter V if your MS4 does not contain <br />structural pollution control devices or none were inspected. Enter "NA" if the data does not <br />exist: <br />*Total <br />*Structural pollution control devices: I i I i 1 100 <br />Yes Ej No <br />❑ Yes gg No <br />E. *Did you repair, replace, or maintain any structural pollution control devices? 0 Yes (I No <br />www.pca.state.mn.us - 651-296.6300 - 800-657-3864 - TTY 651-282-5332 or 80d-657-3864 - Availabte in alternative formats <br />wq-strm4-06 * 12119113 Page 4 of 5 <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.