My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2014
>
2014-09-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2014 3:30:26 PM
Creation date
9/5/2014 3:05:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Owner: City of Centerville, 1880 Main St.,Centerville,MN 55038 Date September 3,2014 <br /> ®Stantec Contractor: C&L Excavating,Inc.,7939 Ridgewood Rd.,St.Joseph,MN 56374 <br /> Bond Company: Bond No: <br /> CONSTRUCTION CHANGE ORDER NO. 2 <br /> 2014 ROYAL MEADOWS WATERMAIN IMPROVEMENTS (LABOR BID) <br /> STANTEC PROJECT NO. 193802483 <br /> Description of Work <br /> This Change Order provides for additional work to provide services Off Project to the following addresses: <br /> 1321 Mound Trail,240 LF. <br /> 1759 Peltier Lake Dr.,70 LF. <br /> 1667 Peltier Lake Dr.,70 LF. <br /> 1613 Peltier Lake Dr.,39 LF. <br /> 6948 Dupre Rd.,65 LF. <br /> 7130 Shad Ave.,60 LF. <br /> 6918 Pheasant Ln.,70 LF. <br /> 1688 Heritage,70 LF. <br /> 7353 20th Ave., 102 LF. <br /> 1600 Peltier Lake Dr.,70 LF. <br /> This Change Order also provides for adjustments to the completion dates for this project. Substantial completion date of <br /> September 26,2014 is extended to October 31,2014.Final Completion date of October 10,2014 is extended to <br /> November 14,2014. There is no additional compensation to the Contractor for this change in completion dates. <br /> Contract Unit Total <br /> No. Item Unit Quantity Price Amount <br /> CHANGE ORDER NO.2 <br /> 1 CONNECT WATER SERVICE TO EXISTING EA 10 $1,000.00 $10,000.00 <br /> PLUMBING INSIDE HOME <br /> 2 INSTALL 1"HDPE WATER SERVICE DIRECTIONAL LF 856 $52.00 $44,512.00 <br /> DRILLED-CURB STOP <br /> 3 CONNECT TO EXISTING CURB STOP EA 10 $1,400.00 $14,000.00 <br /> TOTAL CHANGE ORDER NO. 2: $68,512.00 <br /> 193802483CH02-laborAsm <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.