My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2014
>
2014-09-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2014 3:30:26 PM
Creation date
9/5/2014 3:05:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF CENTERVILLE <br /> p :` te�yiiCCle <br /> MON THL Y ENGINEER'S REPOR T <br /> For the September 10, 2014 City Council Meeting <br /> 'E.Clr,ki.-died 1857 <br /> Italics=New information. <br /> Normal = No change from last report. <br /> 1. 2013 Street and Utility Improvements (193801520). Wear course paving and the saw and seal <br /> have been completed. Final inspections and punch fist work are in process. <br /> 2. Centerville Road (CSAH 21) Reconstruction (193801639). The County has awarded the project, <br /> with the City electing to not extend sewer and water south of Dupre Road. The County is working <br /> through the permitting with Rice Creek Watershed District;construction start date to be determined. <br /> 3. 2014 Mill and Overlay Project(193801941). The contractor has started to pave the base course <br /> in the full removal areas(Old Mill Road, 73rd Street, Quebec). Patching is ongoing in the other areas. <br /> Substantial completion(paving of the wear course)is specified for September 12, 2014. <br /> 4. Royal Meadows Water Main (193802483). Approximately 30 services have been completed, with <br /> approximately 8-10 services remaining. The contractor is planning to complete this work this week, and <br /> begin patching and restoration next week, the week of September 8. <br /> 5. 21St Ave., North of Main St. (193802667). The project will extend city water to the north in order <br /> to service future commercial/retail development in the area. Sewer service immediately along 21St Ave. <br /> will come from Lino Lakes'facilities in 21St Avenue. Lino Lakes is administering this project. <br /> The utility work is complete, next fs curb and gutter installation and paving of the base course. <br /> 6. Miscellaneous (193801743). <br /> • T-Mobil has submitted a proposal to install 3 new antennas on the water tower. Staff is in <br /> process of working through the permitting process <br /> 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.