Laserfiche WebLink
Anoka County Contract No. 2013-0626A <br /> AMENDMENT NO. 1 <br /> TO JOINT POWERS AGREEMENT <br /> FOR THE RECONSTRUCTION OF <br /> COUNTY STATE AID HIGHWAY 21 (CENTERVILLE ROAD) FROM COUNTY STATE AID <br /> HIGHWAY 34 (BIRCH STREET) TO CSAH 14 (MAIN STREET) IN THE CITIES OF <br /> CENTERVILLE AND LINO LAKES, MN <br /> COUNTY PROJECT NO. S.A.P. 002-621-10 <br /> THIS AMENDMENT is made and entered into this day of <br /> 2014, the date of the signature of the parties notwithstanding, by and between the County of <br /> Anoka, a political subdivision of the State of Minnesota, 2100 Third Avenue, Anoka, Minnesota <br /> 55303, hereinafter referred to as the "County," and the City of Centerville, 1880 Main Street, <br /> Centerville, Minnesota 55038, hereinafter referred to as the "City". <br /> WITNESSETH: <br /> WHEREAS, it is mutually agreed upon that the County and the City wish to amend its <br /> Joint Powers Agreement for the reconstruction of CSAH 21 (Centerville Road) between CSAH <br /> 34 (Birch St) and CSAH 14 (Main St), hereinafter referred to as the "Project"; and, <br /> WHEREAS, Section XII. ENTIRE AGREEMENT REQUIREMENT OF A WRITING of <br /> said Agreement provides that any alterations, variations or modifications of the provisions of this <br /> Agreement shall be valid only when they have been reduced to writing and duly signed by the <br /> parties. <br /> NOW, THEREFORE, in consideration of the mutual covenants hereinafter stated or <br /> contained in the Agreement, the parties do hereby agree as follows: <br /> 1. The parties agree to delete Section III "Costs" of Anoka County Contract <br /> No. 2013-0626 in its entirety and replace it with the following: <br /> The contract costs of the work, or if the work is not contracted, the cost of all labor, <br /> materials, normal engineering costs and equipment rental required to complete the work, shall <br /> constitute the actual "construction costs" and shall be so referred to herein. "Estimated costs" <br /> are good faith projections of the costs, which will be incurred for this project. Actual costs will <br /> vary and those will be the costs for which the relevant parties will be responsible. <br /> This cost estimate includes a storm sewer cost share for the project of 75% City/25% County. <br /> 67 <br />