My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2014
>
2014-10-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2014 1:19:52 PM
Creation date
10/17/2014 1:19:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Unit Current Quantity Amount <br /> No. Item Unit Quantity Price Quantity to Date to Date <br /> CHANGE ORDER NO.2 <br /> 1 CONNECT WATER SERVICE TO EXISTING PLUMBING INSIDE HOME EA 10 1000.00 $0.00 <br /> 2 INSTALL 1"HDPE WATER SERVICE DIRECTIONAL DRILLED-CURB STOP LF 856 52.00 863 863 $44,876.00 <br /> 3 CONNECT TO EXISTING CURB STOP EA 10 1400.00 9 9 $12,600.00 <br /> TOTAL CHANGE ORDER NO. 2: $57,476.00 <br /> TOTAL PART 1:ROYAL MEADOWS WATERMAIN IMPROVEMENTS(LABOR) $205,991.60 <br /> TOTAL PART 2:OFF-PROJECT SERVICES (LABOR) $23,180.00 <br /> TOTAL CHANGE ORDER NO.1 $68,500.00 <br /> TOTAL CHANGE ORDER NO.2 $57,476.00 <br /> TOTAL WORK COMPLETED TO DATE $355,147.60 <br /> 193802483RFP2 Labor zlsm <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.