Laserfiche WebLink
November 12,2014 <br /> Mike Ericson <br /> Page 2 of 2 <br /> Reference: 2015Thin Bituminous Overlay Project-Feasibility Report <br /> If it is the goal of the City Council to prudently maintain their bituminous streets in a manner which <br /> maximizes the life of the pavements at minimum life-cycle costs, then the above improvements are <br /> necessary, cost effective and feasible. <br /> Regards, <br /> Stantec Consulting Services, Inc. <br /> 047 <br /> '.1k. S;�� <br /> Mark Statz,PE <br /> City Engineer <br /> Phone:61-604-4709 <br /> mark.statz@stantee.com <br /> Attachment: Project Cost Estimate <br /> c. Brian Hare,Lee Mann-Stantec <br /> Paul Palzer-Public Works Director <br /> sm document2 <br /> Des gr with cornmunrty in mind <br />