Laserfiche WebLink
Contract Unit Current Quantity Amount <br /> No. Item Unit Quantity Price Quantity to Date to Date <br /> PART 1:2014 THIN BITUMINOUS OVERLAY(LABOR) <br /> 1 MOBILIZATION LS 1 4999.00 0.5 0.5 $2,499.50 <br /> 2 TRAFFIC CONTROL LS 1 1393.20 0.5 0.5 $696.60 <br /> 3 EDGE MILL BITUMINOUS 6'WIDE LF 19525 1.17 17208 17208 $20,133.36 <br /> 4 MILL BITUMINOUS CONSTRUCTION JOINT LF 390 7.00 370 370 $2,590.00 <br /> 5 SAW CUT BITUMINOUS LF 4240 1.65 919 919 $1,516.35 <br /> 6 INSTALL TACK COAT GAL 1820 2.00 1785 1785 $3,570.00 <br /> 7 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) - SY 3350 3.44 2718 2718 $9,349.92 <br /> 8 INSTALL NON-WEAR COURSE-SPNWB330E TON 603 18.45 400.28 400.28 $7,385.17 <br /> 9 INSTALL 1.0"WEAR COURSE OVERLAY-SPWEA340E TON 2413 14.00 2480.22 2480.22 $34,723.08 <br /> 10 STREET SWEEPER(PICKUP BROOM W/OPERATOR) HR 26 119.83 $0.00 <br /> TOTAL PART 1:2014 THIN BITUMINOUS OVERLAY(LABOR) $82,463.98 <br /> ALTERNATIVE 1:WEST LEG OF LAKELAND CIRCLE(LABOR) <br /> 11 TRAFFIC CONTROL LS 1 1.03 1 1 $1.03 <br /> 12 EDGE MILL BITUMINOUS 6'WIDE LF 1718 1.25 1776 1776 $2,220.00 <br /> 13 MILL BITUMINOUS CONSTRUCTION JOINT LF 60 20.00 30 30 $600.00 <br /> 14 INSTALL TACK COAT GAL 163 2.00 154 154 $308.00 <br /> 15 INSTALL 1.0"WEARING COURSE OVERLAY-SPWEA340E TON 212 14.00 217 217 $3,038.00 <br /> 16 STREET SWEEPER(PICKUP BROOM W/OPERATOR) HR 2 119.83 $0.00 <br /> TOTAL ALTERNATIVE 1:WEST LEG OF LAKELAND CIRCLE(LABOR) $6,167.03 <br /> ALTERNATIVE 2:STEVEN LANE(LABOR) <br /> 17 TRAFFIC CONTROL LS 1 1.03 1 1 $1.03 <br /> 18 EDGE MILL BITUMINOUS 6'WIDE LF 824 1.81 914 914 $1,654.34 <br /> 19 MILL BITUMINOUS CONSTRUCTION JOINT LF 60 20.00 120 120 $2,400.00 <br /> 20 INSTALL TACK COAT GAL 78 2.00 74 74 $148.00 <br /> 21 INSTALL 1.0"WEARING COURSE OVERLAY-SPWEA340E TON 102 14.00 104 104 $1,456.00 <br /> 22 STREET SWEEPER (PICKUP BROOM W/OPERATOR) HR 1 119.83 $0.00 <br /> TOTAL ALTERNATIVE 2.STEVEN LANE(LABOR) $5,659.37 <br /> ALTERNATIVE 3:BRIAN COURT(LABOR) <br /> 23 TRAFFIC CONTROL LS 1 1.03 I 1 $1.03 <br /> 24 EDGE MILL BITUMINOUS 6'WIDE LF 591 2.38 748 748 $1,780.24 <br /> 25 MILL BITUMINOUS CONSTRUCTION JOINT LF 30 20.00 65 65 $1,300.00 <br /> 26 INSTALL TACK COAT GAL 56 2.00 53 53 $106.00 <br /> 27 INSTALL 1.0"WEARING COURSE OVERLAY-SPWEA340E TON 73 17.93 75 75 $1,344.75 <br /> 28 STREET SWEEPER(PICKUP BROOM W/OPERATOR) HR 1 119.83 $0.00 <br /> TOTAL ALTERNATIVE 3:BRIAN COURT(LABOR) $4,532.02 <br /> CHANGE ORDER NO.1 <br /> 1 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) SY 1500 3.44 933 933 $3,209.52 <br /> 2 INSTALL TACK COAT GAL 75 2.00 59 59 $118.00 <br /> 3 INSTALL NON-WEAR COURSE TN 330 18.45 320 320 $5,904.00 <br /> 4 AGGREGATE BASE CLASS 5 TN 250 24.00 413.2 413.2 $9,916.80 <br /> TOTAL CHANGE ORDER NO. 1 $19,148.32 <br /> TOTAL PART 1:2014 THIN BITUMINOUS OVERLAY(LABOR) $82,463.98 <br /> TOTAL ALTERNATIVE 1:WEST LEG OF LAKELAND CIRCLE(LABOR) $6,167.03 <br /> TOTAL ALTERNATIVE 2:STEVEN LANE(LABOR) $5,659.37 <br /> TOTAL ALTERNATIVE 3:BRIAN COURT(LABOR) $4,532.02 <br /> TOTAL CHANGE ORDER NO. 1 $19,148.32 <br /> TOTAL WORK COMPLETED TO DATE $117,970.72 <br /> 193801941 Labor-Omarn Bros rdsm <br /> 30 <br />