My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2014
>
2014-12-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2014 12:07:58 PM
Creation date
12/6/2014 12:06:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Unit Current Quantity Amount <br /> No. Item Unit Quantity Price Quantity to Date to Date <br /> PART 1:2014 THIN BITUMINOUS OVERLAY(LABOR) <br /> 1 MOBILIZATION LS 1 4999.00 0.5 1 $4,999.00 <br /> 2 TRAFFIC CONTROL LS 1 1393.20 0.5 1 $1,393.20 <br /> 3 EDGE MILL BITUMINOUS 6'WIDE LF 19525 1.17 17208 $20,133.36 <br /> 4 MILL BITUMINOUS CONSTRUCTION JOINT LF 390 7.00 370 $2,590.00 <br /> 5 SAW CUT BITUMINOUS LF 4240 1.65 919 $1,516.35 <br /> 6 INSTALL TACK COAT GAL 1820 2.00 1785 $3,570.00 <br /> 7 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) SY 3350 3.44 933 3651 $12,559.44 <br /> 8 INSTALL NON-WEAR COURSE-SPNWB330E TON 603 18.45 400.28 $7,385.17 <br /> 9 INSTALL 1.0"WEAR COURSE OVERLAY-SPWEA340E TON 2413 14.00 2480.22 $34,723.08 <br /> 10 STREET SWEEPER (PICKUP BROOM W/OPERATOR) HR 26 119.83 37 37 $4,433.71 <br /> TOTAL PART 1:2014 THIN BITUMINOUS OVERLAY (LABOR) $93,303.31 <br /> ALTERNATIVE 1:WEST LEG OF LAKELAND CIRCLE(LABOR) <br /> 11 TRAFFIC CONTROL LS 1 1.03 1 $1.03 <br /> 12 EDGE MILL BITUMINOUS 6'WIDE LF 1718 1.25 1776 $2,220.00 <br /> 13 MILL BITUMINOUS CONSTRUCTION JOINT LF 60 20.00 30 $600.00 <br /> 14 INSTALL TACK COAT GAL 163 2.00 154 $308.00 <br /> 15 INSTALL 1.0"WEARING COURSE OVERLAY-SPWEA340E TON 212 14.00 217 $3,038.00 <br /> 16 STREET SWEEPER (PICKUP BROOM W/OPERATOR) HR 2 119.83 3.92 3.92 $469.73 <br /> TOTAL ALTERNATIVE 1:WEST LEG OF LAKELAND CIRCLE(LABOR) $6,636.76 <br /> ALTERNATIVE 2:STEVEN LANE(LABOR) <br /> 17 TRAFFIC CONTROL LS 1 1.03 1 $1.03 <br /> 18 EDGE MILL BITUMINOUS 6'WIDE LF 824 1.81 914 $1,654.34 <br /> 19 MILL BITUMINOUS CONSTRUCTION JOINT LF 60 20.00 120 $2,400.00 <br /> 20 INSTALL TACK COAT GAL 78 2.00 74 $148.00 <br /> 21 INSTALL 1.0"WEARING COURSE OVERLAY-SPWEA340E TON 102 14.00 104 $1,456.00 <br /> 22 STREET SWEEPER (PICKUP BROOM W/OPERATOR) HR 1 119.83 2 2 $239.66 <br /> TOTAL ALTERNATIVE 2:STEVEN LANE(LABOR) $5,899.03 <br /> ALTERNATIVE 3:BRIAN COURT(LABOR) <br /> 23 TRAFFIC CONTROL LS 1 1.03 1 $1.03 <br /> 24 EDGE MILL BITUMINOUS 6'WIDE LF 591 2.38 748 $1,780.24 <br /> 25 MILL BITUMINOUS CONSTRUCTION JOINT LF 30 20.00 65 $1,300.00 <br /> 26 INSTALL TACK COAT GAL 56 2.00 53 $106.00 <br /> 27 INSTALL 1.0"WEARING COURSE OVERLAY-SPWEA340E TON 73 17.93 75 $1,344.75 <br /> 28 STREET SWEEPER (PICKUP BROOM W/OPERATOR) HR 1 119.83 2 2 $239.66 <br /> TOTAL ALTERNATIVE 3:BRIAN COURT(LABOR) $4,771.68 <br /> CHANGE ORDER NO.1 <br /> 1 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) SY 1500 3.44 941 1874 $6,446.56 <br /> 2 INSTALL TACK COAT GAL 75 2.00 59 $118.00 <br /> 3 INSTALL NON-WEAR COURSE TN 330 18.45 320 $5,904.00 <br /> 4 AGGREGATE BASE CLASS 5 TN 250 24.00 61.6 474.8 $11,395.20 <br /> TOTAL CHANGE ORDER NO. 1 $23,863.76 <br /> TOTAL PART 1:2014 THIN BITUMINOUS OVERLAY(LABOR) $93,303.31 <br /> TOTAL ALTERNATIVE 1:WEST LEG OF LAKELAND CIRCLE (LABOR) $6,636.76 <br /> TOTAL ALTERNATIVE 2:STEVEN LANE(LABOR) $5,899.03 <br /> TOTAL ALTERNATIVE 3:BRIAN COURT(LABOR) $4,771.68 <br /> TOTAL CHANGE ORDER NO. 1 $23,863,76 <br /> TOTAL WORK COMPLETED TO DATE $134,474.54 <br /> 193801941 Labor-Omann Bros RFP2FINAL alsm <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.