My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2014
>
2014-12-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2014 12:07:58 PM
Creation date
12/6/2014 12:06:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Unit Current Quantity Amount <br /> No. Item Unit Quantity Price Quantity to Date to Date <br /> PART 1:2014 THIN BITUMINOUS OVERLAY(MATERIALS) <br /> 1 BITUMINOUS MATERIAL FOR TACK COAT GAL 2232 2.00 1785 1785 $3,570.00 <br /> 2 BITUMINOUS WEARING COURSE MIXTURE-SPWEA340E TON 2430 49.10 2480.22 2480.22 $121,778.80 <br /> 3 BITUMINOUS BASE COURSE MIXTURE(PATCHING)-SPNWB330E TON 1955 44.80 400.28 400.28 $17,932.54 <br /> TOTAL PART 1:2014 THIN BITUMINOUS OVERLAY (MATERIALS) $143,281.35 <br /> ALTERNATIVE 1:WEST LEG OF LAKELAND CIRCLE(MATERIALS) <br /> 4 BITUMINOUS MATERIAL FOR TACK COAT GAL 195 2.00 154 154 $308.00 <br /> 5 BITUMINOUS WEARING COURSE MIXTURE-SPWEA340E TON 213 49.10 217 217 $10,654.70 <br /> TOTAL ALTERNATIVE 1:WEST LEG OF LAKELAND CIRCLE(MATERIALS) $10,962.70 <br /> ALTERNATIVE 2:STEVEN LANE(MATERIALS) <br /> 6 BITUMINOUS MATERIAL FOR TACK COAT GAL 94 2.00 74 74 $148.00 <br /> 7 BITUMINOUS WEARING COURSE MIXTURE-SPWEA340E TON 102 49.10 104 104 $5,106 40 <br /> TOTAL ALTERNATIVE 2:STEVEN LANE(MATERIALS) $5,254.40 <br /> ALTERNATIVE 3:BRIAN COURT(MATERIALS) <br /> 8 BITUMINOUS MATERIAL FOR TACK COAT GAL 67 2.00 53 53 $106.00 <br /> 9 BITUMINOUS WEARING COURSE MIXTURE-SPWEA340E TON 73 49.10 75 75 $3,682.50 <br /> TOTAL ALTERNATIVE 3:BRIAN COURT(MATERIALS) $3,788.50 <br /> CHANGE ORDER NO.1 <br /> 1 BITUMINOUS MATERIAL FOR TACK COAT GAL 75 2.00 59 59 $118.00 <br /> 2 BITUMINOUS BASE COURSE MIXTURE(PATCHING SPNWB330E) TN 330 49.10 320 320 $15,712.00 <br /> TOTAL CHANGE ORDER NO. 1: $15,830.00 <br /> TOTAL PART 1:2014 THIN BITUMINOUS OVERLAY (MATERIALS) $143,281.35 <br /> TOTAL ALTERNATIVE 1.WEST LEG OF LAKELAND CIRCLE(MATERIALS) $10,962.70 <br /> TOTAL ALTERNATIVE 2.STEVEN LANE(MATERIALS) $5,254.40 <br /> TOTAL ALTERNATIVE 3:BRIAN COURT(MATERIALS) $3,788.50 <br /> TOTAL CHANGE ORDER NO. 1. $15,830.00 <br /> TOTAL WORK COMPLETED TO DATE $179,116.95 <br /> 193801941RFP1 Materials-Commercial Asphalt xlsm <br /> 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.