Laserfiche WebLink
<br />. . <br /> <br /> <br /> <br />TO: Honorable Mayor & City Council Members <br /> <br />FROM: Kim Stephan <br /> <br />SUBJECT: Parks & Recreation Committee Recommendation <br />Play Structure at Laurie LaMotte Memorial Park <br /> <br />DATE: April 6, 2006 <br /> <br />Laurie LaMotte Memorial Park Plav Structure <br /> <br />The committee has researched play structure equipment over the last months, requesting and receiving <br />three (3) bids from EF Andersen - $44,479, GameTime - MinnesotalWisconsin Playground - $42,800, <br />and Play World Systems - $40,450. The merits of each were discussed. The cost estimates were <br />similar, but the equipment varied some. All included a drain system, wood fiber as fault material and <br />recycled timbers used for borders. The recycled shredded material the committee has been interested <br />in using is quite expensive through these companies, so it was not included in the estimates. The <br />committee felt that GameTime had much more to offer in the way of equipment, with only expending a <br />few thousand dollars more than the lowest bid. Installation is also included in the GameTime bid. <br />Committee Member Seeley requested the committee look at the shredded recycled material for the <br />fault zone one more time as she feels adamantly it is both more environmentally and economically <br />feasible over time. Committee Member Seeley's estimate for an area somewhat smaller than the area <br />proposed by GameTime was $10,600. The amount for wood fiber included in the estimate of $42,800 <br />from GameTime was $5,880. Wood chips need to be replaced every few years, the representative <br />Committee Member Seeley worked with stated the shredded recycled material travels less than wood <br />chips and on average 5% is replaced every 5 years, at current rates that would be $480. <br /> <br />The committee has $45,000 budgeted and has received $13,050 in donations for this project. <br />Committee Member Seeley will go back to the representative with the shredded recycled materials <br />with the plan from GameTime to get an exact price quote. The committee would like to go ahead with <br />ordering the play structure equipment to be installed as soon as possible this spring, leaving the fault <br />protection material to be determined at the next scheduled committee meeting. <br /> <br />Motion was made by Chairperson Peterson, seconded by Committee Member Amundsen to <br />recommend City Council accept the bid from GameTime in the amount of $42,800 for play <br />structure equipment, drainage, recycled border and installation, excluding the amount of $5,880 <br />at this time for fault protection material, with funds to be expended from Park Dedication Fees. <br />All in favor. Motion passed unanimously. <br /> <br />/f <br />