Project Name: 2015 Thin Bituminous Overlay Project I hereby certify that this is an exact
<br /> (30Sta ntec reproduction of bids received.
<br /> City Project No.: Stantec Project No.: 193803042 loo i
<br /> Bid Opening:Wednesday,February 11,2015 at 4 P.M.,CST Owner: City of Centerville„MN "" ��
<br /> Mark R.Statz
<br /> License No.42717
<br /> Bidder No.1 Bidder No.2 Bidder No.3 Bidder No.4
<br /> BID TABULATION Valley Paving,Inc. North Valley,Inc. Knife River Corporation-NC Hardrives,Inc.
<br /> Item
<br /> Num Item Units Qty Unit Price Total Unit Price Total Unit Price Total Unit Price Total
<br /> PART 1-ROBIN LANE AREA
<br /> 1 MOBILIZATION LS 1 $7,800.00 $7,800.00 $3,743.00 $3,743.00 $7,000.00 $7,000.00 $12,000.00 $12,000.00
<br /> 2 TRAFFIC CONTROL LS 1 $400.00 $400.00 $374.30 $374.30 $2,500.00 $2,500.00 $3,000.00 $3,000.00
<br /> 3 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) SY 6500 $1.50 $9,750.00 $2.13 $13,845.00 $3.80 $24,700.00 $1.75 $11,375.00
<br /> 4 SAWING BITUMINOUS PAVEMENT LF 105 $6.50 $682.50 $4.12 $432.60 $4.00 $420.00 $2.00 $210.00
<br /> 5 SUBGRADE EXCAVATION CY 100 $31.00 $3,100.00 $19.25 $1,925.00 $4.00 $400.00 $25.00 $2,500.00
<br /> 6 STREET SWEEPER WITH OPERATOR HR 10 $125.00 $1,250.00 $122.98 $1,229.80 $165.00 $1,650.00 $50.00 $500.00
<br /> 7 AGGREGATE BASE,CLASS 5 TN 1600 $14.85 $23,760.00 $1297 $20,752.00 $12.00 $19,200.00 $9.00 $14,400.00
<br /> 8 BITUMINOUS MATERIAL FOR TACK COAT GAL 300 $2.20 $660.00 $3.05 $91500 $2.50 $750.00 $2.00 $600.00
<br /> 9 TYPE SP 9.5 WEARING COURSE MIXTURE(3,E) TN 575 $73.75 $42,406.25 $69.79 $40,12925 $70.00 $40,250.00 $71.00 $40,825.00
<br /> 10 TYPE SP 12.5 NON-WEAR COURSE MIXTURE(3,E) TN 775 $66.85 $51,808.75 $63.90 $49,522.50 $64.00 $49,600.00 $65.00 $50,375.00
<br /> 11 SAW AND SEAL LF 1200 $4.30 $5,160.00 $4.44 $5,328.00 $4.15 $4,980.00 $4.50 $5,400.00
<br /> 12 FOUNDATION PREPARATION SY 6500 $0.47 $3,055.00 $0.42 $2,730.00 $0.35 $2,275.00 $1.00 $6,500.00
<br /> 13 ADJUST VALVE BOX EA 6 $530.00 $3,180.00 $267.36 $1,604.16 $325.00 $1,950.00 $405.00 $2,430.00
<br /> 14 ADJUST MANHOLE CASTING EA 9 $585.00 $5,265.00 $491.94 $4,427.46 $375.00 $3,375.00 $545.00 $4,905.00
<br /> 15 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 350 $32.80 $11,480.00 $30.53 $10,685.50 $25.00 $8,750.00 $27.50 $9,625.00
<br /> 16 REMOVE AND REPLACE CONCRETE CURB AND GUTTER ( LF 200 $25.70 $5,140.00 $33.65 $6,730.00 $28.50 $5,700.00 $34.00 $6,800.00
<br /> 17 PROTECTION OF CATCH BASIN EA 5 $60.00 1300.00 $251.32 $1.256.60 $175.00 S875.00 $54.00 $270.00
<br /> TOTAL PART 1-ROBIN LANE AREA $175,197.50 $165,630.17 $174,375.00 $171,715.00
<br /> T
<br /> PART 2-MILL AND OVERLAY AREAS
<br /> 18 MOBILIZATION LS 1 $8,000.00 $8,000.00 $5,881.86 $5,881.86 $10,000.00 $10,000.00 $12,000.00 $12,000.00
<br /> 19 TRAFFIC CONTROL LS 1 $2,250.00 $2,250.00 $2,299.27 $2,299.27 $5,000.00 $5,000.00 $3,000.00 $3,000.00
<br /> 20 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) SY 3700 $3.70 $13,690.00 $2.45 $9,065.00 $4.50 $16,650.00 $1.75 $6,475.00
<br /> 21 SAWING BITUMINOUS PAVEMENT LF 5500 $0.01 $55.00 $2.13 $11,715.00 $1.75 $9,625.00 $0.10 $550.00
<br /> 22 1"MILL BITUMINOUS PAVEMENT SY 25520 $0.80 $20,416.00 $0.80 $20,416.00 $1.40 $35,728.00 $2.20 $56,144.00
<br /> 23 MILL BITUMINOUS CONSTRUCTION JOINT SY 90 $4.30 $387.00 $18.08 $1,627.20 $6.00 $540.00 $0.01 $0.90
<br /> 24 BITUMINOUS MATERIAL FOR TACK COAT GAL 1125 $2.20 $2,475.00 $3.05 $3,431.25 $2.50 $2,812.50 $2.00 $2,250.00
<br /> 25 TYPE SP 9.5 WEARING COURSE MIXTURE(3,E) TN 1900 $70.95 $134,805.00 $69.79 $132,601.00 $69.00 $131,100.00 $72.00 $136,800,00
<br /> 26 AGGREGATE BASE,CLASS 5 TN 200 $7.00 $1,400.00 $18.02 $3,604.00 $10.00 $2,000.00 $9.00 $1,800.00
<br /> 27 BITUMINOUS BASE COURSE PATCHING(Y'LIFE SY 7400 $8.85 $65,490.00 $8.69 $64,306.00 $6.75 $49,950.00 $4.75 $35,150.00
<br /> (TYPE SP12.5 NON-WEAR COURSE MIXTURE(3.E))
<br /> 28 ADJUST VALVE BOX EA 15 $150.00 $2,250.00 $267.36 $4,010.40 $325.00 $4,875.00 $275.00 $4,125,00
<br /> 29 ADJUST MANHOLE CASTING EA 46 $445.00 $20,470.00 $491.94 $22,629.24 $375.00 $17,250.00 $415.00 $19,090,00
<br /> 30 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 1500 $28.85 $43,275.00 $29.12 $43,680.00 $25.00 $37,500.00 $31.65 $47,475.00
<br /> 31 REMOVE AND REPLACE CONCRETE CURB AND GUTTER(I LF 600 $22.90 $13.740.00 $32.38 119.428.00 $28.50 t17,100.00 $32.00 t19,200.00
<br /> TOTAL PART 2-MILL AND OVERLAY AREAS $328,703.00 $344,694.22 $340,130.50 $344,059.90
<br /> BID SUMMARY
<br /> TOTAL PART 1-ROBIN LANE AREA $175,197.50 $165,630.17 $174,375.00 $171,715.00
<br /> TOTAL PART 2-MILL AND OVERLAY AREAS 4328.703.00t344.694.22 4 44
<br /> .059.90
<br /> TOTAL BASE BID $503,900.50 $510,324.39 $514,505.50 $515,774.90
<br /> Contractor Name and Address.Valley Paving,Inc. North Valley,Inc. Knife River Corporation-No.Central Hardrives,Inc.
<br /> 8800 13th Avenue East 20015 Iguana St.NW,Ste.100 4787 Shadow Wood Drive NE 14475 Quvam Drive
<br /> Shakopee.MN 55379 Nowthen,MN 55330 Sauk RaDAS.MN 56379 Rogers.MN 55374
<br /> Phone:952-445-8615 763-274-2580 320-251-9472 764-428-8886
<br /> Fax 952-445-0355 763-274-2584 320-251-0011 763-428-8868
<br /> Email:brent2vallevoavina,com contactus�no�hvallevinc n tot dlobello�hardnvesinc com
<br /> Signed By: Brent A.Carron Brad Schmidtbauer John F Quade Daniel LoBello
<br /> Title:Vice President President President Projct Manager
<br /> Bid Security:Bid Bond Bid Bond Bid Bond Bid Bond
<br /> Addenda Acknowledged:1,2 1,2 1,2 1,2
<br /> 193803C P
<br />
|