Laserfiche WebLink
2/24/2015 M S4 Annual Report for 2014 <br /> control program? [Part IV.B.] <br /> Yes <br /> • No <br /> MCM 5: Post-Construction Stormwater Management <br /> The following questions refer to Part III.D.5. of the Permit. <br /> Q59 Between January 1 , 2014 and December 31 , 2014, did you update your regulatory <br /> mechanism(s) to incorporate all requirements as specified in Part III.D.5.a. of the <br /> Permit? <br /> • Yes <br /> No <br /> Q61 What approach are you using, or planning to use, to meet the performance <br /> standard for Volume, Total Suspended Solids (TSS), and Total Phosphorus (TP) <br /> as required by the Permit? [Part III.D.5.a.(2)] <br /> Check all that apply. <br /> Refer to the link http://www.pca.state.mn.us/index.php/view-document.htmI? <br /> gid=17815 for guidance on stormwater management approaches. <br /> Retain a runoff volume equal to one inch times the area of the proposed increase of imperviou <br /> surfaces on-site <br /> Retain the post-construction runoff volume on site for the 95th percentile storm <br /> Match the pre-development runoff conditions <br /> Adopt the Minimal Impact Design Standards (MIDS) <br /> An approach has not been selected <br /> Other method (Must be technically defensible--e.g. based on modeling, research and <br /> acceptable engineering practices) <br /> Q62 Do you have written Enforcement Response Procedures (ERPs) to compel <br /> compliance with your post-construction stormwater management regulatory <br /> mechanism(s)? [Part III.B.] <br /> • Yes <br /> No <br /> Q64 Between January 1 , 2014 and December 31 , 2014, did you modify your BMPs, <br /> measurable goals, or future plans for your post-construction stormwater <br /> management program? [Part IV.B.] <br /> Yes <br /> .. No <br /> MCM 6: Pollution Prevention/Good Housekeeping for Municipal Operations <br /> https://www.snapsurveys.com/wh/siam/surveylanding/printerviewer.asp?sid=746[1 07A34726C6C62313432343739323734312E3932 10/13 <br />