Laserfiche WebLink
® Stantec Project Name:2015 Thin Bituminous Overlay Project I hereby c&tdy that this rs an exact <br /> rePVV0 Aa7 ofbofs reeervD. <br /> CM Project No.: Slantec Project No.: 193803042 '0�74 , e <br /> Bid Opening:Wednesday,February 11,2015 at 4 P.M.,CST Owner:qty of centemne,MN % �c <br /> Malt R.Stat• <br /> License No.42717 <br /> Bidder No.1 Bidder No.2 Bidder No.3 Bidder No.4 <br /> BID TABULATION Valley Paving,Inc. North Valley,Inc. Knife River Corporation-NC Hardrives,Inc. <br /> Item <br /> Ntmr Item Units Qty Unit Price Total Unit Price Total Unit Price Total Unit Price Total <br /> PART 1-ROBIN LANE AREA <br /> I MOBILIZATION tS 1 $7,800.00 $7,800.00 $3,743.00 53,743.00 $7,000.00 $7,000.00 $12,000.00 $12,000.00 <br /> 2 TRAFFIC CONTROL LS 1 $400.00 $400.00 $374 30 $374.30 $2,500.00 $2,50000 $3,000.00 $3,000.00 <br /> 3 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) SY 6500 $1.50 $9,75000 $2.13 $13,845.00 $380 $24,700.00 $1 75 $11.375.00 <br /> 4 SAWING BITUMINOUS PAVEMENT LF LOS $650 $682.50 $4.12 $432.60 $4.00 $420 00 $2.00 $210.00 <br /> 5 SUBGRADE EXCAVATION CY 100 $3100 $3,100.00 $1925 $1.925.00 $400 $400.00 $25.00 $2,500.00 <br /> 6 STREET SWEEPER WITH OPERATOR HR 10 $125.00 $1,250.00 $122.98 $1,229.80 $165.00 $1,650.00 $50.00 $500 00 <br /> 7 AGGREGATE BASE,CLASS 5 TN 1600 $1485 $23,760.00 $12.97 $20,752.00 $12.00 $19,200.00 $9.00 $14,400.00 <br /> 8 BITUMINOUS MATERIAL FOR TACK COAT GAL 300 $220 $66000 $3.05 $91500 $2.50 $750.00 $2.00 $60000 <br /> 9 TYPE SP 9.5 WEARING COURSE MIXTURE(3,E) TN 575 $7375 $42,406.25 $69.79 $40,129.25 $7000 $40,250.00 $71.00 $40,825.00 <br /> 10 TYPE SP 12.5 NON-WEAR COURSE MIXTURE(3,E) TN 775 $66.85 $51,808.75 $63.90 $49.522.50 $64.00 $49,60000 $65.00 $50,37500 <br /> 11 SAW AND SEAL LF 1200 $4.30 $5,160.00 $444 $5,32800 $415 $4,98000 $4.50 $5,400.00 <br /> 12 FOUNDATION PREPARATION SY 6500 $0.47 $3,055.00 $0.42 $2,730.00 $0.35 $2,275.00 $1.00 $6,500.00 <br /> 13 ADJUST VALVE BOX to 6 $530.00 $3,180.00 $267.36 $1.60416 $32500 $1,950.00 $405.00 $2,430.00 <br /> 14 ADJUST MANHOLE CASTING EA 9 $585.00 $5,265.00 $491.94 $4,427.46 $375.00 $3,375.00 $545.00 $4,905.00 <br /> 15 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 350 $32.80 $11.480.00 $30.53 $10.685.50 $25.00 $8,750.00 $27.50 $9,625.00 <br /> 16 REMOVE AND REPLACE CONCRETE CURB AND GUTTER ( LF 200 $25 70 $5,140.00 $33.65 $6,730.00 $28.50 $5,700.00 $34.00 $6,800.00 <br /> 17 PROTECTION OF CATCH BASIN EA 5 $60.00 1300Do $251.32 $1,256.60 $175.00 $875, $54.00 <br /> TOTAL PART 1-ROBIN LANE AREA 51751197.50 $165,630.17 $174,375.00 $171,715.00 <br /> PART 2-MILL AND OVERLAY AREAS <br /> 18 MOBILIZATION LS 1 $8,000.00 $8,000.00 $5,881.86 $5,88186 $10,000.00 $10,00000 $12,000.00 $12,000.00 <br /> 19 TRAFFIC CONTROL LS 1 $2,250.00 $21250.00 $2,299.27 $2,299.27 $5,000.00 $5,000.00 $3,000.00 $3,000.00 <br /> 20 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) SY 3700 $370 $13.690.00 $2.45 $9,065.00 $4.50 $16,650.00 $1.75 $6,475.00 <br /> 21 SAWING BITUMINOUS PAVEMENT LF 5500 $001 $55.00 $2.13 $11,715.00 $1.75 $9,625.00 $0.10 $550.00 <br /> 22 1"MILL BITUMINOUS PAVEMENT SY 25520 $0.80 $20.416.00 $0.80 $20,416.00 $1.40 $35,728.00 $2.20 $56,144.00 <br /> 23 MILL BITUMINOUS CONSTRUCTION JOINT SY 90 $4.30 $387.00 $1806 $1,627.20 $6.00 $540.00 $0.01 $0.90 <br /> 24 BITUMINOUS MATERIAL FOR TACK COAT GAL 1125 $2.20 $2,475.00 $3.05 $3,431.25 $2.50 $2,812.50 $2.00 $2,250.00 <br /> 25 TYPE SP 9.5 WEARING COURSE MIXTURE(3,E) TN 1900 $70.95 $134.805.00 $69.79 $132,601 00 $69.00 $131,100.00 $72.00 $136,800.00 <br /> 26 AGGREGATE BASE,CLASS 5 TN 200 $7.00 $1,400.00 $1802 $3,604.00 $10.00 $2,000.00 $9.00 $1,800.00 <br /> 27 BITUMINOUS BASE COURSE PATCHING(2"LIFT) SY 7400 $8.85 $65,490.00 $8.69 $64,306.00 $6.75 $49,95000 $4.75 $35,150.00 <br /> (TYPE SP12.5 NON-WEAR COURSE MIXTURE(3.E)1 <br /> 28 ADJUST VALVE BOX FA 15 $150.00 $2,250.00 $267.36 $4,010.40 $325.00 $4,875.00 $275.00 $4,125.00 <br /> 29 ADJUST MANHOLE CASTING EA 46 $445.00 $20.470.00 $491.94 $22,629.24 $375.00 $17,250.00 $415.00 $19.090.00 <br /> 30 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 1500 $28.85 $43,275.00 $29.12 $43,680.00 $25.00 $37,500.00 $31.65 $47,475.00 <br /> 31 REMOVE AND REPLACE CONCRETE CURB AND GUTTER(I LF 600 12290 t13,740.00 13238 tlgA28 $2850 $17,100.00 $32.00 119,200 <br /> TOTAL PART 2-MILL AND OVERLAY AREAS $328,703.00 $344.694.22 $340,130.50 $344,059.90 <br /> BID SUMMARY <br /> TOTAL PART 1-ROBIN LANE AREA $175,197.50 $165,63017 $174,375.00 $171,715.00 <br /> TOTAL PART 2-MILL AND OVERLAY AREAS $328,703-00 Q",694.22 $344,059.90 <br /> TOTAL BASE BID $503,900.50 $510.324.39 $514,505.50 $515,774.90 <br /> Contractor Name and Address:Valley Paving,Inc North Valley,Inc Knife River Corporation-No.Central Hardnves,Inc. <br /> 8800 13th Avenue East 20015 Iguana St NW,Ste.100 4787 Shadow Wood Drive NE 14475 Qwram Drive <br /> Shakooee,MN 55379 Nowthen,MN 55330 Sauk Raods.MN 56379 Rogers.MN 55374 <br /> Phone:952-445-8615 763-274-2580 320-251-9472 764428-8886 <br /> Fax 952445-0355 763-274-2584 320-251-0011 763-428-8868 <br /> Email:orent9tvallevDavinpcorn roniactus�northvalle�nc netnet dl�llo0hardnvesinc comcom <br /> a Signed By:Brent A Carron Brad Schmidttuer John F.Quade Daniel LoBello <br /> Title:Vice President President President Proict Manager <br /> Bid Security:B4 Bond Bid Bond Bid Bond Bid Band <br /> Addenda Acknowledged:1,2 1,2 1,2 1,2 <br /> 193"31420T ft, BT-1 <br />