My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-08 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-04-08 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2015 4:20:16 PM
Creation date
4/3/2015 4:19:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Permitted Activity <br /> Install and maintain a 48-inch equivalent arch pipe culvert spanning the complete <br /> width of the Premises approximately 920 feet south of LaMotte Drive as shown on <br /> Exhibit"A", attached hereto and incorporated herein. The installation of the culvert <br /> will require that the contractor work under the Board's 42-inch raw water conduit. <br /> The contractor shall provide a steel support beam and Board forces will chain the <br /> conduit to the beam, observe the culvert construction and backfilling, and remove the <br /> chain. <br /> 2. Conditions <br /> All work shall be performed in accordance with good engineering practices and in <br /> accordance with approved plans for the CSAH Reclaim/Overlay and Reconstruction <br /> Project S.A.P. 002-621-010 on file in the offices of Board and City. <br /> 3. Notification <br /> Permittee or Permittee's contractor shall notify Board's Vadnais Supervisor at least <br /> 48 hours in advance of permitted activity to schedule inspection and coordination of <br /> work. Board's Vadnais Supervisor may be reached between the hours of 8 a.m. - 4 <br /> p.m. at 651-775-6192, except on weekends and holidays. <br /> 4. Insurance <br /> Section 30 of the June 9, 1966 Agreement is hereby amended to require that the City's <br /> contractor name the City of Saint Paul, the Board of Water Commissioners of the City <br /> of Saint Paul, and their officials, employees, agents and representatives as additional <br /> insureds with primary coverage on a noncontributory basis under its commercial <br /> general liability policy, with a coverage limit of at least $1.5 million per claim and <br /> $2.0 million aggregate. <br /> 5. Liability <br /> Except in the case of negligent or intentional acts or omissions by the contractor, the <br /> City shall not be responsible for damage that may occur to the Board's conduit during <br /> construction of the culvert. <br /> This Agreement is made and executed pursuant to and under the authority of Resolution <br /> numbered 15-468 adopted by the Board of Water Commissioners of the City of Saint Paul on the <br /> 10th day of March, 2015, a copy of said Resolution being annexed hereto and by this reference <br /> incorporated herein and made a part hereof the same as if set forth verbatim. <br /> [Remainder of page left intentionally blank.] <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.