® Stantec
<br /> Bidder No.5 Bidder No.6 Bidder No.6
<br /> BID TABULATION Midwest Asphalt Corp Park Construction Co. Oman Brothers Paving,Inc.
<br /> Item
<br /> Num Item Units QtY Unit Price Total Unit Price Total Unit Price Total
<br /> PART 1-ROBIN LANE AREA
<br /> 1 MOBILIZATION LS 1 $14,000.00 $14,000 DO $10,000.00 $10,000.00 $4,000.00 $4,00000
<br /> 2 TRAFFIC CONTROL LS 1 $3,000.00 $3,000.00 $10,054.00 $10,054.00 $500.00 $500.00
<br /> 3 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) SY 6500 $2.00 $13,000.00 $2.40 $15,60000 $4.40 $28,600.00
<br /> 4 SAWING BITUMINOUS PAVEMENT LF 105 $4.00 $420.00 $3.30 $346.50 $150 $157.50
<br /> 5 SUBGRADE EXCAVATION CY 100 $25.00 $2,500.00 $26.00 $2,600.00 $19.15 $1,915.00
<br /> 6 STREET SWEEPER WITH OPERATOR HR 10 $100.00 $1,00000 $120.00 $1,200.00 $14000 $1,400.00
<br /> 7 AGGREGATE BASE,CLASS 5 TN 1600 $10.00 $16,000 DO $1760 $28.160.00 $13.50 $21,600 00
<br /> 8 BITUMINOUS MATERIAL FOR TACK COAT GAL 300 $2.00 $600.00 $3.05 $915.00 $275 $825.00
<br /> 9 TYPE SP 9.5 WEARING COURSE MIXTURE(3,E) TN 575 $73.00 $41,975.00 $72.60 $41,74500 $77.00 $44,275.00
<br /> 10 TYPE SP 12.5 NON-WEAR COURSE MIXTURE(3,E) TN 775 $6600 $51,150 DO $67.80 $52,545.00 $75.00 $58,125.00
<br /> 11 SAW AND SEAL LF 1200 $5.50 $6,600.DO $3.00 $3,600.00 $428 $5,136.00
<br /> 12 FOUNDATION PREPARATION SY 6500 $1 DO $6,500 00 $0.91 $S'91500 $079 $5,135.00
<br /> 13 ADJUST VALVE BOX EA 6 $250.00 $1,500.00 $417.00 $2,50200 $150.00 $900.00
<br /> 14 ADJUST MANHOLE CASTING EA 9 $670.00 $6,030.00 $542.00 $4,878.00 $540.00 $4,860.00
<br /> 15 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 350 $34.00 $11,900.00 $27.40 $9,590.00 $31.67 $11,084.50
<br /> 16 REMOVE AND REPLACE CONCRETE CURB AND GUTTER ( LF 200 $45.00 $91000.00 $27.90 $5,580.00 $39.18 $7,836.00
<br /> 17 PROTECTION OF CATCH BASIN EA 5 $150.00 1750.00 $199.00 $90.00 $450.00
<br /> TOTAL PART 1-ROBIN LANE AREA $185,925.00 $196,225.50 $196,799.00
<br /> PART 2-MILL AND OVERLAY AREAS
<br /> 18 MOBILIZATION LS 1 $14,000.00 $14,000.00 $19,000.00 $19,000.00 $7,500.00 $7,500.00
<br /> 19 TRAFFIC CONTROL LS 1 $10,000.00 $10,000.00 $2,150.00 $2,150.00 $2,200.00 $2,200.00
<br /> 20 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) SY 3700 $2.50 $9,250.00 $0.69 $2,55300 $5.47 $20,239.00
<br /> 21 SAWING BITUMINOUS PAVEMENT LF 5500 $2.50 $13,750.00 $2.15 $11,825.00 $1.50 $8,250.00
<br /> 22 1"MILL BITUMINOUS PAVEMENT SY 25520 $0.70 $17,864.00 $1.05 $26,796.00 $1.10 $28,072.00
<br /> 23 MILL BITUMINOUS CONSTRUCTION JOINT SY 90 $5.00 $450.00 $6.15 $553.50 $1000 $900.00
<br /> 24 BITUMINOUS MATERIAL FOR TACK COAT GAL 1125 $2.DO $2,25000 $305 $3,431.25 $2.75 $3,093.75
<br /> 25 TYPE SP 9.5 WEARING COURSE MIXTURE(3,E) TN 1900 $70.00 $133,000.00 $72.70 $138,13000 $77.00 $146,300.00
<br /> 26 AGGREGATE BASE,CLASS 5 TN 200 $19.00 $3,800.00 $20.40 $4,080.00 $14.00 52,800.00
<br /> 27 BITUMINOUS BASE COURSE PATCHING(2"LIFT) SY 7400 $9.50 $70,300.00 $15.00 $111,000.00 $11.50 $85,100.00
<br /> (TYPE SP12 5 NON-WEAR COURSE MIXTURE(3 EI)
<br /> 28 ADJUST VALVE BOX EA 15 $250.00 $3,750.00 $438.00 $6,570.00 $150.00 $2,250.00
<br /> 29 ADJUST MANHOLE CASTING FA 46 $670.00 $30,820.00 $51000 $23,46000 $75000 $34,500.00
<br /> 30 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 1500 $40.00 $60,000.00 $23.90 $35,85000 $28.59 $42,885.00
<br /> 31 REMOVE AND REPLACE CONCRETE CURB AND GUTTER(I LF 600 $48.00 $28.8M.DQ $22.20 S13,320.00 $3802
<br /> TOTAL PART 2-MILL AND OVERLAY AREAS $396,034.00 $398,718.75 $406,901.75
<br /> BID SUMMARY
<br /> TOTAL PART 1-ROBIN LANE AREA $185,925.00 $196,799.00 $196,799.00
<br /> TOTAL PART 2-MILL AND OVERLAY AREAS 1398,034.00 $398,718.75 $406,901.75
<br /> TOTAL BASE BID $583,959.00 $595,517.75 $603,700.75
<br /> Contractor Name and Address:Midwest Asphalt Corporation Park Construction Company Omann Brothers Paving,Inc
<br /> 6340 Industrial Drive,Ste.200 1481 81st Avenue NE 6551 LaBeaux Ave NE,PO Box 120
<br /> Eden Prairie,MN 55346 Mmneaoolis,MN 55432 Albertville.MN 55301
<br /> Phone:952-937-8033 763-786-9800 763-497-8259
<br /> Fax 952-937.6910 763-717-6238 763-497-8261
<br /> Email:kstichatAmidwesiasohelt net mchnstianson arkconslructt co aan umanninc corn
<br /> Signed By:Matthew].Timmers Michael Christianson Kelly Omann
<br /> Title:Vice President Vice President President
<br /> Bid Security:Bid Bond Bid Bond Bid Bond
<br /> Addenda Acknowledged-11,2 1,2 1,2
<br /> 19390304287 As. BT-2
<br />
|