Laserfiche WebLink
® Stantec <br /> Bidder No.5 Bidder No.6 Bidder No.6 <br /> BID TABULATION Midwest Asphalt Corp Park Construction Co. Omann Brothers Paving,Inc. <br /> Iters <br /> Num Item Units QtY Unit Rice Total Unit Price Total Unit Price Total <br /> PART 1-ROBIN LANE AREA <br /> 1 MOBILIZATION LS 1 $14,000.00 $14,00000 $10,000.00 $10,000.00 $4,000.00 $4,000.00 <br /> 2 TRAFFIC CONTROL LS 1 S3,D00.00 $3,000.00 $10,054.00 $10,054.00 $500.00 $500.00 <br /> 3 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) 5Y 6500 $2.00 $13,000.00 $2.40 $15,60000 $440 $28,600.00 <br /> 4 SAWING BITUMINOUS PAVEMENT LF 105 $4.00 $420.00 $3.30 $346.50 $1.50 $157.50 <br /> 5 SUBGRADE EXCAVATION CY 100 $2500 $2.500.00 $26.00 $2,600 00 $19.15 $1,915.00 <br /> 6 STREET SWEEPER WITH OPERATOR HR 10 $100.00 $1,00000 $120.00 $1,200.00 $14000 $1,400.00 <br /> 7 AGGREGATE BASE,CLASS 5 TN 1600 $10.00 $16,000 00 $1760 $28.160.00 $13.50 $21,600 00 <br /> 8 BITUMINOUS MATERIAL FOR TACK COAT GAL 300 $2.00 $600.00 $3.05 $91500 $275 $825.00 <br /> 9 TYPE SP 9.5 WEARING COURSE MIXTURE(3,E) TN 575 $73.00 $41,975.00 $72.60 $41,745 00 $77.00 $44,275.00 <br /> 10 TYPE SP 12.5 NON-WEAR COURSE MIXTURE(3,E) TN 775 $66.00 $51,15000 $67.80 $52,545.00 $75.00 $58,125.00 <br /> 11 SAW AND SEAL LF 1200 $5.50 $6,600.00 $300 $3,600.00 $4,28 $5,136.00 <br /> 12 FOUNDATION PREPARATION SY 6500 $100 $6,500 00 $0.91 $5,91500 $0.79 $5,135.00 <br /> 13 ADJUST VALVE BOX EA 6 $250.00 $1,500.00 $417.00 $2,502.00 4150.00 $900.00 <br /> 14 ADJUST MANHOLE CASTING FA 9 $670.00 $6,030.00 $542.00 $4,878.00 $540.00 $4,860.00 <br /> 15 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 350 $34.00 $11.900.00 $27.40 $9,590.00 $31.67 $11,084.50 <br /> 16 REMOVE AND REPLACE CONCRETE CURB AND GUTTER ( LF 200 $45.00 $9,000.00 $27.90 $5,580.00 $3918 $7,836.00 <br /> 17 PROTECTION OF CATCH BASIN EA 5 4150.00 S750.DO $199.00 1995.00 $90.00 $450.00 <br /> TOTAL PART 1-ROBIN LANE AREA $185,925.00 $196,225.50 $196,799.00 <br /> PART 2-MILL AND OVERLAY AREAS <br /> 18 MOBILIZATION L5 1 $14,000.00 $14,000.00 $19,000.00 $19,000.00 $7.500.00 $7,500.00 <br /> 19 TRAFFIC CONTROL LS 1 $10,000.00 $10,000.00 $2,150.00 $2,150.00 $2,200.00 $2,200.00 <br /> 20 REMOVE BITUMINOUS PAVEMENT(FULL DEPTH) SY 3700 $2.50 $9,250.00 $0.69 $2,553.00 $547 $20,239.00 <br /> 21 SAWING BITUMINOUS PAVEMENT LF 5500 $2.50 $13,750.00 $2.15 $11,825.00 $1.50 $8,250.00 <br /> 22 1"MILL BITUMINOUS PAVEMENT SY 25520 $0.70 $17,864.00 $1.05 $26.796.00 $1.10 $28,072.00 <br /> 23 MILL BITUMINOUS CONSTRUCTION JOINT SY 90 $5.00 5450.00 $6.15 $553.50 $10.00 $900.00 <br /> 24 BITUMINOUS MATERIAL FOR TACK COAT GAL 1125 $2.00 $2,25000 $305 $3.431.25 $2.75 $3,093.75 <br /> 25 TYPE SP 9.5 WEARING COURSE MD(TURE(3,F) TN 1900 $70.00 $133,000.00 $72.70 $138,130 00 $77.00 $146,300.00 <br /> 26 AGGREGATE BASE,CLASS 5 TN 200 $19.00 $3,800.00 $20.40 $4.080.00 $14.00 $2,800.00 <br /> 27 BITUMINOUS BASE COURSE PATCHING(2-LIFT) SY 7400 $9.50 $70,300.00 $15.00 $111,000.00 $11 50 $85,100.00 <br /> (TYPE SP12 5 NON-WEAR COURSE MD(TURE(3 E)) <br /> 28 ADJUST VALVE BOX EA 15 $250.00 $3,750.00 $436.00 $6,570.00 $150.00 $2,250.00 <br /> 29 ADJUST MANHOLE CASTING EA 46 $67000 $30,820.00 $510.00 $23,46000 175000 $34,500.00 <br /> 30 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 1500 $40.00 460,000.00 $23.90 $35,85000 $28.59 $42,885 00 <br /> 31 REMOVE AND REPLACE CONCRETE CURB AND GUTTER(I LF 600 $48.00 $28,8M.00 $22.20 S13,32D.00 $3802 <br /> TOTAL PART 2-MILL AND OVERLAY AREAS $398,034.00 $398,718.75 $406,901.75 <br /> BID SUMMARY <br /> TOTAL PART I-ROBIN LANE AREA $185,925.00 $196,799.00 $196,799.00 <br /> TOTAL PART 2-MILL AND OVERLAY AREAS t396,034.Q0 <br /> TOTAL BASE BID $583,959.00 $595,517.75 $603,700.75 <br /> Contractor Name and Address:Midwest Asphalt Corporation Park Construction Company Omenn Brothers Paving,Inc <br /> 6340 Industrial Drive,Ste.200 1481 81st Avenue NE 6551 LaBeaux Ave NE,PO Box 120 <br /> Eden Prairie,MN 55346 Minneaoolis,MN 55432 Albertville,MN 55301 <br /> Phone:952-937-8033 763-786-9800 763-497-8259 <br /> Fax 952-937-6910 763-717-6238 763-497-8261 <br /> Email:ksticha midwestasM)alt net nichrist)anson0varkconstructionco co avin amanninc com <br /> Signed By:Matthew).Timmers Michael Christianson Kelly Omann <br /> Title:Vice President Vice President President <br /> Bid Secunty:Bid Bond Bid Bond Bid Bond <br /> Addenda Acknowledged 1,2 1,2 1,2 <br /> 1938030426r dvn BT-2 <br />