My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-05 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2015
>
2015-05-05 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2015 2:26:05 PM
Creation date
5/1/2015 2:25:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table A-2. Wastewater Flow Variation Factors for Determining Infiltration/Inflow Mitigation <br /> Goals.....................................................................................................................................47 <br /> Table A-3. Community Forecasts of Sewered Population, Households, and Employment.....48 <br /> Table A-4. Community Wastewater Flow Projections ............................................................56 <br /> Appendix B—Surface Water Management ...............................................................................64 <br /> Appendix B-1: Nonpoint Source Pollutants............................................................................64 <br /> Appendix B-2: Priority Lakes List...........................................................................................65 <br /> Appendix C - System Plan Requirements .................................................................................73 <br /> Appendix C-1: Wastewater System Plan Elements................................................................73 <br /> Appendix C-2:Local Surface Water Management Plan Elements..........................................75 <br /> Appendix C-3: Local Water Supply Plan Elements................................................................77 <br /> Appendix D—Summary of Policies and Implementation Strategies ..........................................79 <br /> Water Resources Policy Plan Overall Goal and Policy..........................................................79 <br /> Working toward Sustainability using the Watershed Management Approach.........................79 <br /> Working toward Sustainability of our Water Supplies.............................................................79 <br /> Planning for Regional Growth................................................................................................80 <br /> Water Conservation and Reuse.............................................................................................82 <br /> Assessment of Regional Water Resources............................................................................83 <br /> Investment.............................................................................................................................84 <br /> WastewaterServices.............................................................................................................85 <br /> AppendixE —Definitions...........................................................................................................88 <br /> Appendix F — Map of Regional Wastewater System Long-Term Service Areas.........................93 <br /> List of Figures <br /> Figure 1.Thrive MSP 2040 Community Designations...............................................................10 <br /> Figure 2. Communities Served by the Prairie du Chien Jordan Aquifer.....................................16 <br /> Figure 3. Priority Lakes and the Metropolitan Parks and Open Space System..........................24 <br /> Figure 4. Metropolitan Plant Effluent Total Phosphorus, 1998-2013..........................................26 <br /> List of Tables <br /> Table 1. Regional System Wastewater Treatment Plants..........................................................32 <br /> Table 2. Municipal Wastewater Treatment Plants .....................................................................33 <br /> Table 3. Planned Wastewater Treatment Plant Capacity (million gallons per day)....................36 <br /> Table 4. Sewered Population and Employment Forecasts (thousands).....................................37 <br /> Table 5. Treatment Plant Flow Projections (million gallons per day)..........................................38 <br /> Table 6. Long-Term Capital Improvement Program ($ millions) ................................................39 <br /> Table 7. Estimated Replacement Value of Regional Wastewater System .................................41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.