Laserfiche WebLink
THE <br /> CONNECTING.ACHIEVING PREPARING <br /> OBSERVER <br /> • R DISTRICT COMMUNJY NEWS <br /> ..w. <br /> izr <br /> Construction Plans <br /> Nearly$60 million in construction Is replacement,condensing boiler The District sold$2 88 million <br /> scheduled In our Centennial addition,parking lot replacement, in General Obligation Capital <br /> Schools to address maintenance tuckpointing and exterior FBCI lltles Bonds,$3 7 In General <br /> Issues and Improve learning maintenance Obligation Tax Abatement Bonds <br /> environments The majority of and$49 9 In General Obligation <br /> the work will take place In the DISTRICT OFFICE AND Bonds which were voter-approved <br /> summers of 2015 and 2016 Newer DISTRICT-WIDE to finance the projects As good <br /> f schools are scheduled first since Board Room audio visual upgrades, stewards of public resources,the <br /> 7 w - they require less work and less roof replacement,tuckpointing District was able to sell the bonds <br /> design time and exterior maintenance work, at a better rate than anticipated, <br /> az <br /> D 0 phone system upgrades,computer saving over$3 5 million to our <br /> i a a v f AT BLUE HERON ELEMENTARY network Improvements,building taxpayers <br /> 5,) <br /> i o u a Gym dehumidification,parking <br /> lot resurfacing,tuckpointing <br /> and exterior maintenance work, <br /> Cel ling tele and floor replacement, Thanks to the support of the community, <br /> condensing boiler and controls <br /> and plumbing upgrades the District is able to make the necessary <br /> AT GOLDEN LAKE ELEMENTARY repairs to our buildings and upgrade <br /> Enclosing classrooms on the classrooms to ensure appropriate learning <br /> first floor as well as the library <br /> for safety,security and sound, spaces for our students <br /> oreplace onginal casework,Interior <br /> o N doors and hallway flooring,update <br /> a a z mechanical system(boiler,HVAC, <br /> uo� <br /> I�� plumbing and fixtures),roof <br /> J r z replacement and tuckpointing access,security and visitor The District Is also using Health <br /> -tea <br /> u Z J management systems,master and Safety resources,approved <br /> o d AT RICE LAKE ELEMENTARY clock and Intercom systems by the Department of Education, <br /> e U Replacement of the all-purpose to finance projects The projects <br /> gym floor and ceiling tile,water SUMMER OF 2016 AND 2017 and the timeline were determined <br /> heater and parking lot,restroom The District's older buildings- by a long-range facility plan <br /> upgrades,tuckpointing and Centerville Elementary,Centennial approved by the Board In 2014 <br /> exterior maintenance Elementary and Centennial High <br /> School-require the most extensive Construction Information is posted <br /> CENTENNIAL MIDDLE SCHOOL work Construction will begin when online at isd12 org <br /> Improvements to the cafeteria school Is out in 2016,and work on <br /> and common areas,carpet the High School will continue Into <br /> replacement,air handling 2017 The Performing Arts Center <br /> upgrades,chiller plant will also see upgrades <br /> L E4 1 <br /> CIA=N TIE CENTBNIBI SCM=I KWENI NNE NULS MNILNEN IN NUI to t;'t <br /> Thank you,Barb ReOnler,for your eight years Makenzle Hart and Ryan Meany led the Initiative to pack 75,000 t,°:, Y t <br /> of service as a Centennial School Board Member meats for children in developing countries as part of their National <br /> Welcome,Kathryn Timm,elected to the School Honor Society service project More than 360 students and staff T <br /> Board in November,along with incumbents volunteered to meet the goal of the FMSC MobilePack-event held <br /> Suzy Guthmueller and John Burns Their terms at Centennial High School Hart and Meany rallied the community and <br /> will be up in 2018 raised$16,283 from 14 companies and Individuals to fund the project <br /> DISTRICT OFFICE 4707 North Road I Circle Pines,MN 55014'.763 7926000 <br />