My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-24 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-06-24 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2015 2:58:05 PM
Creation date
6/19/2015 2:57:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Centerville <br /> Council Meeting Minutes <br /> June 10,2015 <br /> a. Relocation/Creation of Dirt Pile/Sledding Hill—Laurie LaMotte Memorial Park <br /> Administrator Ericson stated that at last week's Parks & Recreation Committee meeting, <br /> discussion ensued regarding the excess dirt from recent ditch project and the possibility of <br /> constructing a sledding hill within the park. Administrator Ericson stated that a neighboring <br /> community constructed the same sort of project. The Committee requested that the item be <br /> researched regarding relocation costs to move the dirt pile closer to the hockey rink. <br /> Council discussion ensued regarding liability, cost of relocation,lighting, etc. <br /> Motion by Council Member Fehrenbacher,seconded by Council Member King to table this <br /> item for additional research. All in favor. Motion carried. <br /> 2. 2015 Crack Filling City Streets <br /> a. Nugent Sealcoating, Inc. - $.53/Linear Foot <br /> b. SealTech, Inc. -$.70/Linear Foot <br /> C. Gopher State Sealcoat, Inc. - $.99/Linear Foot(by End of Aug. or$.79/Linear <br /> Foot by End of Oct.) <br /> d. Allied Blacktop Company—Min. of 25,000 Linear Feet= $28,750 <br /> e. Fahmer Asphalt Searlers - $1.00/Linear Foot <br /> Mayor Wilharber was amazed at the cost differences between the bidders. Administrator Ericson <br /> stated that Building Official Palzer recommended low bidder (Nugent Sealcoating, Inc.) for a <br /> maximum amount of$25,000 or 47,000 linear feet of roadway. Engineer Statz stated that the <br /> work would be for crack filing of existing roadways in the city except those involved with the <br /> 2014 and 2015 Mill&Overlay Projects. <br /> Motion by Council Member Fehrenbacher, seconded by Council Member Love to enter <br /> into a contract for the 2015 Crack Fillips of municipal streets for 2015 with Nugent <br /> Sealcoating, Inc. at $.53/linear foot with a not to exceed amount of$25,000. All in favor. <br /> Motion carried. <br /> X. COUNCIL &ADMINISTRATION ANNOUNCEMENTS <br /> 1. Administrator Report <br /> Administrator Ericson stated that most of his update had been provided to Council via his weekly <br /> report. <br /> 2. Council & Staff Reports <br /> Engineer Statz stated that they are cleaning up storm sewer issued in preparation of rain prior to <br /> preparing the roadway for asphalt. Mayor Wilharber had been approached by a resident who <br /> was confused about the replacement of some of the storm sewer(s) along the roadway and he <br /> provided correct information to the gentleman. <br /> Page 4 of 5 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.