My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-07-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 3:19:40 PM
Creation date
7/17/2015 3:18:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® Stantec Memo <br /> To: Mike Ericson From: Mark Statz <br /> City Administrator-Centerville City Engineer <br /> File: 193801639-CSAH 21 Reconstruction Date: July 17,2015 <br /> Reference: CSAH 21 Joint Powers Agreement(JPA)Amendment#2 <br /> The attached is a proposed amendment to the Joint Powers Agreement (JPA) between the City of <br /> Centerville and Anoka County. The JPA is the primary document outlining the responsibilities of the <br /> two parties in relation to the construction,funding and maintenance of the CSAH 21 (Centerville <br /> Road) reconstruction project. <br /> The JPA Amendment encompasses several component parts,all of which have been previously <br /> presented to and approved by the City Council. This is simply the formal,contractual action <br /> needed to memorialize these changes which include: <br /> • Lowering of the trunk storm sewer to avoid conflict with the MCES Forcemain. This change <br /> was necessary because the MCES would not accept our original design calling for the <br /> forcemain to be "offset" around the storm sewer. <br /> • Additional ditch work and lowering of the culvert under the regional trail to avoid conflicts <br /> with the St. Paul Water Utility's Raw Water Main. Records indicated this main was <br /> underneath the existing culvert, but these records were in error. <br /> • Removal of the colored concrete intersections on Main Street.This work was added to the <br /> project after receiving a favorable quote from the contractor. <br /> Attachment: JPA Amendment #2 <br /> c. Paul Palzer-Public Works Director <br /> Greg Burmeister- Lead Project Inspector <br /> Teresa Bender-Clerk <br /> Brian Hare-Stantec <br /> Design with community In mind <br /> sm v:\1938\achve\193803123\design\csah 21 1pa amendment 2 7 17 15.docx <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.