My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-07-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 3:19:40 PM
Creation date
7/17/2015 3:18:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Home Detail, Inc. <br /> 2562 Tournament Players Cir S <br /> Blaine, MN. 55449 <br /> 612-599-4463 <br /> MyHomeDetail0z)me.com <br /> Schedule for: 7261 Main Street, Centerville,MN. 55038 <br /> Finish drawing—final plan 2-3 weeks <br /> Plan out for bids—2-3 weeks <br /> Submit plan/specs/sworn/to construction lender for approval— 1-2 weeks <br /> Survey lot with home on property— 1-2 weeks <br /> Order floor and roof trusses if home fits on lot—3-4 weeks <br /> Order windows—3-4 weeks <br /> Submit to City for permit(2 sets plans/survey/sub list/energy cal/other) — 1-2 weeks <br /> City approves plan <br /> Dig basement— 1 week <br /> Form footings/inspect footings/install blocks — 1-2 weeks <br /> Water proof/Insulate foundation/drain file <br /> Inspect foundation— 1-week <br /> Dig in sewer&water/inspect sewer&water/backfill foundation/sewer&water— 1 <br /> week <br /> Deliver lumber&trusses/Frame home/install windows/wrap windows/wrap home— <br /> 3-4 weeks <br /> Install shingles/install siding/install stone/install mechanicals plumbing,HVAC, <br /> electrical/inspect framing&mechanicals—2 weeks <br /> Measure and order cabinets—3-4 weeks <br /> Install insulation/inspect insulation— 1 week <br /> Deliver sheetrock/install hang &finish sheetrock/possibly inspect sheetrock—2 weeks <br /> Prime walls&paint ceilings— 1 week <br /> Deliver millwork& cabinets/install millwork&cabinets—2 weeks <br /> Measure for Granite countertops/the/wood floors <br /> Paint& stain was and millwork—2 weeks <br /> Install file/vinyl/wood floors/countertops if available—2 weeks <br /> Final plumbing, HVAC,electrical/final inspection plumbing,HVAC,electrical— 1 <br /> week <br /> Final walk thru/final clean/final inspection/C.O.— 1 week <br /> Driveway/sidewalks/patio/landscaping—Spring of 2016 <br /> * Schedule subject to change based on availability of material, scheduling, inspections, <br /> lender requirements, City requirements,unexpected delays, and/or weather. <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.