Laserfiche WebLink
B. Regional Sanitary Sewer <br /> The AUAR included preparation of a sewer analysis to fully investigate the effects of the <br /> proposed land use scenarios on the systems. Sewer capacity was noted as an issue in the <br /> original AUAR. The 2010 AUAR Update discussed the Lino Lakes Relief Interceptor <br /> (MCES 70-29)that was constructed to address capacity for the area. Additionally,the <br /> sewer was extended along 21"Avenue as well as other trunk improvements to serve <br /> development within the study area in conformance with the AUAR and the <br /> Comprehensive Plan.No other regional sewer projects have occurred since the 2010 <br /> AUAR Update. This study remains valid for this AUAR Update. <br /> C. Regional Water System <br /> The AUAR included an analysis of the city's water system as it related to possible <br /> development in the AUAR Study Area. The city is currently in the process of updating its <br /> Wellhead Protection Plan. Part 1 of the plan has been approved by the Minnesota <br /> Department of Health and Part 2 is currently under review. This update process is in <br /> conformance with the AUAR mitigation plan. <br /> D. Potential Environmental Hazards <br /> Item 9 in the original AUAR included a review of past land use in relation to potential <br /> environmental hazards. This section was updated and includes a review of the Minnesota <br /> Pollution Control Agency's "What's in My Neighborhood"database. The results are in <br /> Appendix C.No significant changes occurred and the mitigation plan remains valid for <br /> the AUAR Update. <br /> E. Stormwater Management <br /> On November 12,2014,the RCWD adopted revised rules that affect the I-35E Corridor <br /> study area. These rules became effective December 1, 2014. These rules supersede past <br /> rules or requirements that were in the 2010 and 2005 AUAR and also incorporate the <br /> Resource Management Plan that was added in the 2010 AUAR Update. These rules are <br /> now in effect for development in the study area and the mitigation plan has been updated <br /> accordingly. <br /> F. Ecologically Sensitive Areas <br /> The AUAR included review and analysis of the ecologically sensitive areas within the <br /> study area. For this update,the DNR Natural Heritage Database information was updated <br /> and is included in Appendix B. This update contains additional known occurrences of <br /> rare species or natural communities within a one-mile radius of the study area as <br /> compared to the data from the original AUAR. The mitigation plan is adequate to <br /> address these sensitive ecological areas and the remaining AUAR analysis remains valid <br /> for this update. <br /> Five Year Update <br /> Lino Lakes I-35E Corridor <br /> Alternative Urban Areawide Review <br /> WSB Project No. 2029-95 Page 4 <br /> 34 <br />