My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-12 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-08-12 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2017 8:58:55 AM
Creation date
8/18/2015 7:41:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
spent down, and is now intended for emergency replacement of unplanned <br />equipment failures. <br />• The truck replacement fund is to replace the production truck. The <br />current truck is fourteen years old. It should be replaced as a part of the <br />HD upgrade of the production track. <br />• The building repair fund is to cover major costs related to the building <br />such as windows, roof, furnace, AC replacement and painting, carpet <br />replacement etc. <br />• The bond reserve is currently closed out, as the building was paid off in <br />2015. <br />• The franchise renewal fund is a reserve fund for the NMTC's upcoming <br />franchise renewal process. Franchise renewal can be very expensive, with <br />the informal negotiation proms costing approximately $200,000 across a <br />three year period. Moving to a formal negotiation process is more <br />expensive. These costs include needs assessments, consWting, and legal <br />fees. <br />settlement agreement with Comcast, anticipated franchise renewal expenses have <br />been postponed until 2017. <br />Budgeted equipment purchases for 2016 is set at $273,016. The first step in the <br />transition to an HD facilW is the Master Control 4avback and routinj swem. A <br />system has been recommended. The cost of the upgrade will be around $575,000. <br />In anticipation of the need to upgrade to HD, all non-critical capital expenditures <br />for 2015 were suspended, with the intent of use the remaining approved funds for <br />the Master Control upgrade. That money, combined with the budgeted money for <br />2016, will be enough to pay for the Master Control upgrade without bonding. The <br />upgrade can be scheduled to begin during the fall of 2015, with an anticipated <br />completion of December 2015. Billing cycles would allow us to split the <br />payments between 2015 and 2016. The capital budget also includes routine <br />computer/software upgrades, and software licenses. The capital equipment budget <br />totals $301,016. <br />Franchise fees paid to the cities are budgeted at $320,000. This is the same as last <br />year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.