Laserfiche WebLink
• Office expenses are budgeted $8,600 higher than the 2015 level. <br />• The building is 11 years old and requiring more care. As such, this line -item was <br />increased. Building maintenance includes the furnacelAC maintenance contract, <br />lawn care, snow removal, carpet and window cleaning, fire inspection, and <br />landscaping and building mechanical services. <br />® Building utilities include sewer, water, gas, and electric. <br />• Insurance includes all property, liability, crime, volunteer, vehicle, and monument <br />sign coverage. <br />• Office supply line item includes all office supplies, and maintenance contracts on <br />printers and copiers. <br />• The Telephone/Internet/Web Hosting line -item was increased to reflect some <br />additional costs. NMTV now pays a fee to house video -on -demand content on a <br />remote server. This allows for unlimited simultaneous vlewing, without a reduction in <br />speed. We have also Incurred more costs with our wireless live transmission of <br />sporting events. This line -item also includes the website maintenance contract, web <br />hosting, telephone costs, and the annual phone software upgrade. <br />• Postage and subscriptions covers the cost of mailing dubs, equipment for contract <br />maintenance, magazines, newspapers, and other postage for the NMTC. <br />• Property tax is for the recycling assessment. <br />• The Commission no longer utilizes the Senior Community Service Employment <br />program for our cleaning service. As such, funds for a cleaning service are included. <br />f-;4, ...... - <br />The 2016 capital budget is set at $301,016. The first step in the transition to an HD <br />facility is the Master Control playback and routing system. The Master Control <br />portion of our HD Upgrade Analysis has been completed. The cost of the upgrade <br />will be around $575,000. In anticipation of the need to upgrade to HD, all non-critical <br />capital expenditures for 2015 were suspended, with the intent to use the remaining <br />approved capital funds for the master control upgrade. That money, combined with <br />the budgeted money for 2016, will be enough to pay for the Master Control upgrade <br />without bonding. The upgrade can be scheduled to begin during the fall of 2015, <br />with an anticipated completion of December 2015. Billing cycles would allow us to <br />split the payments between 2015 and 2016. Further analysis continues to be done <br />on the production truck and studio HD upgrades. <br />Office equipment includes routine computer and software upgrades for office <br />computers. It also includes software Licensing fees. <br />The building was paid off in 2015. <br />Operating expenses have been budgeted $10,958 less than in 2015. While the <br />salary adjustments and benefits increases accounted for an increase in the budget, <br />reduced legal costs resulted in a decrease in total operational expenses. The staff <br />changes include recommended adjustments for several positions and an up -to 2.5% <br />