Laserfiche WebLink
Depreciation • • to fund replacement of • equipment a• <br />Capital• b •ns consist of • -cial assessment collectionsand connection <br />fees. These fees r future expansionof <br />five years. This means that adequate funds are not being reserved, based on <br />the life cycle ofthe capitalfor • <br />Capital Contributions have been significant enough to mitigate the shortfall in <br />most years; however, this results in a reduction of funds available for <br />expansion and inflation of costs. <br />An analysis of annual requirements, based on the replacement cost of the <br />capital items, indicates underfunding of capital reserves. <br />Water and Sewer Funds are well situated for short term needs and liquidity <br />requirements. <br />Recommendation: Small increase in both user charges to cover inflation on an <br />annual basis. <br />