My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2015
>
2015-10-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 4:35:35 PM
Creation date
10/23/2015 4:33:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement. In no event will the Contract Times commence to run later than the sixtieth day <br /> after the day of Bid opening or the thirtieth day after the Effective Date of the Agreement, <br /> whichever date is earlier. <br /> 2.04 Starting the Work <br /> A. Contractor shall start to perform the Work on the date when the Contract Times commence to <br /> run. No Work shall be done at the Site prior to the date on which the Contract Times <br /> commence to run. <br /> 2.05 Before Starting Construction <br /> A. Preliminary Schedules: Within 10 days after the Effective Date of the Agreement (unless <br /> otherwise specified in the General Requirements), Contractor shall submit to Engineer for <br /> timely review: <br /> 1. a preliminary Progress Schedule indicating the times (numbers of days or dates) for starting <br /> and completing the various stages of the Work, including any Milestones specified in the <br /> Contract Documents; <br /> 2. a preliminary Schedule of Submittals; and <br /> 3. a preliminary Schedule of Values for all of the Work which includes quantities and prices of <br /> items which when added together equal the Contract Price and subdivides the Work into <br /> component parts in sufficient detail to serve as the basis for progress payments during <br /> performance of the Work. Such prices will include an appropriate amount of overhead and <br /> profit applicable to each item of Work. <br /> 2.06 Preconstruction Conference; Designation of Authorized Representatives <br /> A. Before any Work at the Site is started, a conference attended by Owner, Contractor, Engineer, <br /> and others as appropriate will be held to establish a working understanding among the parties as <br /> to the Work and to discuss the schedules referred to in Paragraph 2.05.A, procedures for <br /> handling Shop Drawings and other submittals, processing Applications for Payment, and <br /> maintaining required records. <br /> B. At this conference Owner and Contractor each shall designate, in writing, a specific individual <br /> to act as its authorized representative with respect to the services and responsibilities under the <br /> Contract. Such individuals shall have the authority to transmit instructions, receive information, <br /> render decisions relative to the Contract, and otherwise act on behalf of each respective party. <br /> 2.07 Initial Acceptance of Schedules <br /> A. At least 10 days before submission of the first Application for Payment a conference attended <br /> by Contractor, Engineer, and others as appropriate will be held to review for acceptability to <br /> Engineer as provided below the schedules submitted in accordance with Paragraph 2.05.A. <br /> Contractor shall have an additional 10 days to make corrections and adjustments and to <br /> EJCDC C-700 Standard General Conditions of the Construction Contract <br /> Copyright©2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 7 of 62 <br /> 00 72 05 <br /> P141 <br />
The URL can be used to link to this page
Your browser does not support the video tag.