My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2015
>
2015-10-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 4:35:35 PM
Creation date
10/23/2015 4:33:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
employees, agents, consultants, or subcontractors, any duty or authority to supervise or <br /> direct the performance of the Work or any duty or authority to undertake responsibility <br /> inconsistent with the provisions of the Contract Documents. <br /> 3.03 Reporting and Resolving Discrepancies <br /> A. Reporting Discrepancies: <br /> 1. Contractor's Review of Contract Documents Before Starting Work: Before undertaking <br /> each part of the Work, Contractor shall carefully study and compare the Contract <br /> Documents and check and verify pertinent figures therein and all applicable field <br /> measurements. Contractor shall promptly report in writing to Engineer any conflict, error, <br /> ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and <br /> shall obtain a written interpretation or clarification from Engineer before proceeding with <br /> any Work affected thereby. <br /> 2. Contractor's Review of Contract Documents During Performance of Work: If, during the <br /> performance of the Work, Contractor discovers any conflict, error, ambiguity, or <br /> discrepancy within the Contract Documents, or between the Contract Documents and (a) <br /> any applicable Law or Regulation , (b) any standard, specification, manual, or code, or (c) <br /> any instruction of any Supplier, then Contractor shall promptly report it to Engineer in <br /> writing. Contractor shall not proceed with the Work affected thereby (except in an <br /> emergency as required by Paragraph 6.16.A) until an amendment or supplement to the <br /> Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. <br /> 3. Contractor shall not be liable to Owner or Engineer for failure to report any conflict, error, <br /> ambiguity, or discrepancy in the Contract Documents unless Contractor had actual <br /> knowledge thereof. <br /> B. Resolving Discrepancies: <br /> 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of <br /> the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or <br /> discrepancy between the provisions of the Contract Documents and: <br /> a. the provisions of any standard, specification, manual, or code, or the instruction of any <br /> Supplier (whether or not specifically incorporated by reference in the Contract <br /> Documents); or <br /> b. the provisions of any Laws or Regulations applicable to the performance of the Work <br /> (unless such an interpretation of the provisions of the Contract Documents would result <br /> in violation of such Law or Regulation). <br /> 3.04 Amending and Supplementing Contract Documents <br /> A. The Contract Documents may be amended to provide for additions, deletions, and revisions in <br /> the Work or to modify the terms and conditions thereof by either a Change Order or a Work <br /> Change Directive. <br /> EJCDC C-700 Standard General Conditions of the Construction Contract <br /> Copyright©2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 9 of 62 <br /> 00 72 05 <br /> P143 <br />
The URL can be used to link to this page
Your browser does not support the video tag.