My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2015
>
2015-10-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 4:35:35 PM
Creation date
10/23/2015 4:33:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
consequences of the existence or location of the Underground Facility. During such time, <br /> Contractor shall be responsible for the safety and protection of such Underground Facility. <br /> 2. If Engineer concludes that a change in the Contract Documents is required, a Work Change <br /> Directive or a Change Order will be issued to reflect and document such consequences. An <br /> equitable adjustment shall be made in the Contract Price or Contract Times, or both, to the <br /> extent that they are attributable to the existence or location of any Underground Facility <br /> that was not shown or indicated or not shown or indicated with reasonable accuracy in the <br /> Contract Documents and that Contractor did not know of and could not reasonably have <br /> agree on entitlement to or on the amount or extent, if any, <br /> been expected to be aware of or to have anticipated. If Owner and Contractor are of any such adjustment in unable to <br /> Contract Price or Contract Times, Owner or Contractor may make a Claim therefor as <br /> provided in Paragraph 10.05. <br /> 4.05 Reference Points <br /> A. Owner shall provide engineering surveys to establish reference points for construction which in <br /> Engineer's judgment are necessary to enable Contractor to proceed with the Work. Contractor <br /> shall be responsible for laying out the Work, shall protect and preserve the established reference <br /> points and property monuments, and shall make no changes or relocations without the prior <br /> written approval of Owner. Contractor shall report to Engineer whenever any reference point <br /> or property monument is lost or destroyed or requires relocation because of necessary changes <br /> in grades or locations, and shall be responsible for the accurate replacement or relocation of <br /> such reference points or property monuments by professionally qualified personnel. <br /> 4.06 Hazardous Environmental Condition at Site <br /> A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings <br /> known to Owner relating to Hazardous Environmental Conditions that have been identified at <br /> the Site. <br /> B. Limited Reliance by Contractor on Technical Data Authorized- Contractor may rely upon the <br /> accuracy of the "technical data" contained in such reports and drawings, but such reports and <br /> drawings are not Contract Documents. Such "technical data" is identified in the Supplementary <br /> Conditions. Except for such reliance on such "technical data,"Contractor may not rely upon or <br /> make any claim against Owner or Engineer, or any of their officers, directors, members, <br /> partners, employees, agents, consultants, or subcontractors with respect to: <br /> 1. the completeness of such reports and drawings for Contractor's purposes, including, but not <br /> limited to, any aspects of the means, methods, techniques, sequences and procedur <br /> thereto; or es of <br /> construction to be employed by Contractor and safety precautions and programs in <br /> 2. other data, interpretations, opinions and information contained in such reports or shown or <br /> indicated in such drawings; or <br /> 3. any Contractor interpretation of or conclusion drawn from any"technical data" or any such <br /> other data, interpretations, opinions or information. <br /> EJCDC C-700 Standard General Conditions of the Construction Contract <br /> Copyright p 2007 National Society of Professional Engineers for EJCDC. Ali rights reserved. <br /> Page 14 of 62 <br /> 00 72 05 <br /> P14 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.